BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated April 10, 2025

Demolition, site work and new construction of an educational facility in Scituate, Massachusetts. Completed plans call for the demolition of a educational facility; for the construction of a 106,084-square-foot, two-story above grade educational facility; and for site work for a educational facility.

Masonry, Misc. Metals, WD&C, Roofing, Metal Windows, G&G, Tile, ACT, Resilient Floors Terrazzo, Painting, Elev, Fire Protection, Plumbing, HVAC, Electrical REQUEST for GENERAL AND TRADE CONTRACTOR PREQUALIFICATION. Construction of a new 106,084 gsf, two story, New Hatherly Elementary School. Demolition of two existing facilities and site-work included. The estimated cost of construction is $90 million with a construction schedule of 19 months for the new building and 28 months for the entire project. Estimated Cost 90 Million. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Trade Contractor Statement of Qualifications Forms from interested trade subcontractors are sought for the following categories of work: Masonry (ECC $3,568,000), Miscellaneous & Ornamental Iron (ECC $1,366,000), Waterproofing, Damp proofing & Caulking (ECC $857,000), Roofing & Flashing (ECC $2,248,000), Metal Windows (ECC $3,295,000), Glass & Glazing (ECC $54,000), Tile (ECC $647,000), Acoustical Tile (ECC $803,000), Resilient Floors (ECC $578,000), Terrazzo (ECC $308,000), Painting ($320,000), Elevators (ECC $190,000), Fire Protection ($736,000), Plumbing (ECC $2,406,000), HVAC (ECC $8,484,000), Electrical (ECC $7,368,000) Only prequalified General and Trade firms will be permitted to submit bids for the category of work in which they were prequalified. The Owner's Project Manager is The Vertex Companies, LLC. and the Project Designer is Dore + Whittier. All questions regarding this RFQ should be submitted by Noon local time on March 27, 2025. Questions should be submitted by email to Allyson Mahar at Amahar@vertexeng.com, and Laureen Westman at OPMprocurement@vertexeng.com. Do not submit questions by phone. All responses will be posted on www.projectdog.com by 5:00pm on March 31, 2025. RFQ Informational Meeting and/or Optional Site Visit (if applicable) Not Applicable.

Post-Bid

Educational

$90,000,000.00

Public - City

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

83 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
485
Active Projects
180
Bidding Soon
3,698
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

August 25, 2025

Project location map

72 Ann Vinal Rd, Scituate, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.