Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 1, 2025 at 8:00 PM
Updated April 3, 2025
Site work for a transportation facility in Cut Bank, Montana. Working plans call for site work for a transportation facility.
Q Rehabilitate Airport Beacon This work is to include all tools, equipment, materials, and labor to complete this project. Timetables Goals for minority participation for each trade: 4.1% (Applies to Glacier County) Goals for female participation in each trade: 6.9% No pre-bid conference will be held for this project. Faxed bids will not be accepted or considered. The Owner reserves the right to reject any and all bids, to waive informalities, and to reject nonconforming, irregular, non-responsive, or conditional bids. Bids may be held by the Owner for a period not to exceed 90 days from the date of the opening for the purpose of reviewing the bids and investigating the qualifications of the bidder and/or determining bid award based upon available funding prior to award of the Contract. Bids will be received on a price basis as described in the Contract Documents. Bid security in the amount of not less than ten percent (10%) of the amount of the bid, which shall be: (1) lawful money of the United States; or (2) a Cashier’s Check, Certified Check, Bank Money Order or Bank Draft, in any case drawn and issued by a federally chartered or state chartered bank insured by the federal deposit insurance corporation; or (3) a bid bond, guaranty bond, or surety bond executed by a surety corporation authorized to do business in the State of Montana. The bid security shall be made payable to the Owner and failure to enter into a formal contract will result in the Owner retaining the bid security. The successful bidder will be required to enter into a formal contract within the bid period listed in the Contract Documents. Bidder shall be required to provide an insurance certification(s), to furnish a Performance Bond, and furnish a labor and materials Payment Bond within ten (10) calendar days from the date the Notice of Award is received. The bonds shall each be equal to 100 percent of the contract amount. The successful Bidder is required to comply with Montana’s Contractor Registration Law in accordance with Title 39, Chapter 9, MCA
Final Planning
Transportation Terminals
$18,514,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 2, 2025
September 1, 2025
2705 Valier Hwy, Cut Bank, MT
Related To This Project
Cut Bank, MT
Bid Date: May 13 2025
Cut Bank, MT
Bid Date: Jun 04 2025
Cut Bank, MT
Bid Date: Dec 17 2024
Cut Bank, MT
Bid Date: Nov 14 2024
Cut Bank, MT
Bid Date: Nov 13 2025
Cut Bank, MT
Bid Date: Jan 11 2022
Cut Bank, MT
Bid Date: Oct 26 2023
Cut Bank, MT
Bid Date: Feb 28 2023
Cut Bank, MT
Bid Date: Apr 25 2022
Cut Bank, MT
Bid Date: Mar 09 2022
Cut Bank, MT
Bid Date: Sep 06 2024
Baker, MT
Bid Date: Mar 24 2025
Jordan, MT
--
Missoula, MT
Bid Date: Apr 15 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
