EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 15, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Ogden, Utah. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The scope of the Project includes all the labor, materials, tools, and equipment necessary to construct the 1900 W Pipeline Upgrade Project as described in the project plans and specifications. The Work is divided into two bid schedules with the following description: Bid Schedule A includes installing 2,600 feet of 18-inch sewer, 6,000 feet of 24-inch sewer, 30 sewer manholes, 1,820 feet of 12-inch Cured In-Place Pipe (CIPP), rehabilitating 5 existing sewer manholes with epoxy spray-on liner, and 4 trenchless guided bore crossings totaling 364 feet of 42-inch steel casing crossing the Hooper Canal, Wilson Canal, Layton Canal , and Utah Central Railroad. Bid Schedule B includes installing 1,260 feet of 12-inch sewer, 7 sewer manholes, and 1 trenchless guided bore totaling 142 feet of 30-inch casing crossing Union Pacific Railroad. Both schedules include multiple sewer lateral reconnections/extensions, abandoning sewer manholes and pipe, asphalt restoration, curb and gutter restoration, significant traffic control and bypass pumping in 1900 W (UDOT right-of-way) and Midland Drive (Ogden City right-of-way). Please note that the Owner reserves the right to award only Bid Schedule A or both Bid Schedules A and B to the Contractor. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff at contentcase@constructconnect.com. Question Deadline 03/25/2025

Bid Results

Water / Sewer

$19,517,732.00

Public - County

Paving, Site Work

30

14

9

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Tunneling and Mining, Tunnel Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Relining Sewers, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
48
Bidding Soon
641
All Active Projects
276
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

June 2, 2025

img_map_placeholder

Multiple Locations, Ogden, UT


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

1900 W Pipeline Upgrade Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.