BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 7, 2025 at 8:00 PM

Updated June 11, 2025

Site work for a stadium in Syracuse, New York. Completed plans call for site work for a stadium.

The following information outlines the turnkey delivery and installation responsibilities that define the project scope of work. All work listed in this section is the responsibility of the Contractor unless otherwise noted. Contractor is required to provide all labor, materials, tools, supervision, and equipment to perform the following 1. All equipment listed in this Request for Bid must be new and provide the manufacturers stated warranty. Used equipment and/or cabling and accessories will not be accepted. 2. Provide and install new loudspeaker systems in the seating bowl as described in the project design documents. 3. It is the responsibility of the Audio Contractor to provide all rigging work for the loudspeaker system stated in this specification. 4. Provision of the rigging sub-contractor and all associated rigger labor is the responsibility of the Audio Contractor. 5. Rigging work must be performed by qualified structural riggers. The Owner reserves the right to reject proposed riggers subcontracted by the audio contractor, who do not meet University project standards. 6. A master quote for the line array rigging equipment will be provided by Applied Truss and Electronics. 7. Perform a site inspection with your rigging sub-contractor to confirm all stinger attachment points for loudspeaker devices suspended from the roof deck structural steel. 8. Installation of supplemental steel for the loudspeaker array assemblies' suspension points at the roof deck system will be the responsibility of the Audio Contractor. 9. A master quote for the supplemental structural attachment hardware has been provided by ModTruss 10. Attachment installation labor (rigging) for the loudspeakers and motor assemblies to the additional truss, as well as device attachment hardware, is the responsibility of the audio contractor. Reference Number 0000379812 Furnish OnCenter Arena Audio Project Question Acceptance Deadline 03/24/2025 04:00 PM EDT Questions are submitted online No Participation Requirements - Minority Business Participation - Women-Owned Business Participation General Requirements - Insurance Required - License Required - Prevailing Wage Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 %

Post-Bid

Arenas / Stadiums

$40,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
140
Bidding Soon
1,438
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

June 2, 2025

Project location map

515 Montgomery St, Syracuse, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.