EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 3, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Keizer, Oregon. Completed plans call for site work for a water / sewer project.

If it is determined an in-person bid meeting cannot be held, instructions for Bidders to participate remotely will be furnished by addendum. Bidders may inspect the Bid Documents on Friday, March 14, 2025 (call or email to reserve a copy) at: AKS ENGINEERING & FORESTRY, LLC 3700 River Road N., Suite 1 Keizer, OR 97303 CITY OF KEIZER 930 Chemawa Rd. NE Keizer, OR 97303. Prequalification is not required by the City of Keizer. This is a City of Keizer Public Works Project. The construction of this project is NOT federally funded. Bidders must be listed on the Engineer's Plan Holders List for their bid to be considered. Bidders have the responsibility to verify they are listed on the Engineer's Plan Holders List. Bids submitted on forms other than the forms supplied by the Engineer will not be considered. The Engineer's cost estimate is $200,000. In accordance with ORS 279C.370, the First-tier Subcontractor Disclosure Form provided with the Bid Form must be received by 4:00 p.m. local time, April 8, 2025 to allow Bidders two (2) working hours to submit the First-Tier Subcontractor Disclosure Form. Submit the form in a sealed, standard No. 10, business envelope, which may be enclosed in the Bid Envelope. The Work Is Summarized as Follows: Approximately 109 Linear Feet of 36" PVC Storm Drain Pipe, Removal of existing 36" Concrete Storm Drain Pipe, Poured-in-place Concrete Headwall, Removal of existing headwall, Channel Excavation, Fence Salvage, Temporary Fencing, Erosion Control, and other Miscellaneous Items included in the Plans and Specifications. The Contract is subject to ORS 279C.800 to 279C.870 (pertaining to prevailing wages) and no Bid will be received or considered unless the Bid contains a statement by the Bidder that ORS 279C.840 will be complied with. The Bid shall contain a statement indicating whether the Bidder is a "Resident Bidder" as defined in ORS 279A.120. No Bid for a construction contract shall be received or considered by the public contracting agency unless the Bidder is registered with the Construction Contractors Board or (for landscape contracts) licensed by the State Landscape Contractors Board. Basis of Award: The Contract shall be awarded based on the lowest Bid received from a responsive and responsible Bidder. Award is expected at the next City Council Meeting (normally on the first and third Monday night, except on holidays) following the Bid Date. However, the OWNER reserves the right to postpone award until the first or second Council Meeting after the expected Award Date, to reject any Bid not in conformance with all prescribed public bidding procedures and requirements, and to reject, for good cause, any or all Bids upon a finding by the OWNER that it is in the public interest to do so. Any objections to or comments upon the Bid Documents must be submitted in writing to AKS ENGINEERING & FORESTRY, LLC, five (S) workdays before the Bid Opening Date. Bids shall be made on the Bid Forms furnished by the City, addressed and mailed, or delivered to: City Recorder, Keizer City Hall, 930 Chemawa Rd. NE, Keizer, OR 97303 In a sealed 9" x 12" Bid Envelope plainly marked, "McLeod Storm Drain Realignment -- Phase 2", along with the name and address of the Bidder. The Bidder shall not enclose the Project Manual or Plans, or anything else with his/her Bid. It shall be the responsibility of the Bidder to verify their Bid was received. A surety bond, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, cashier's check, or certified check of the Bidder, made payable to the City of Keizer, for ten percent (10%) of the Bid must accompany each Bid as security. Bid security of all, save the three lowest Bidders, will be returned upon execution of the Contract by the successful Bidder. A one hundred percent (100%) Performance Bond and a one hundred percent (100%) Payment Bond on the forms in the Project Manual will be required to guarantee the faithful performance of the Contract. Question Deadline 04/03/2025

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

10

9

2

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
49
Bidding Soon
636
All Active Projects
292
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

June 2, 2025

img_map_placeholder

Multiple Locations, Keizer, OR

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

McLeod Storm Drain Realignment - Phase 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.