EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2025 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a mixed-use development in New Paltz, New York. Completed plans call for site work for a educational facility; for the construction of a warehouse / distribution facility; and warehouse / distribution facility.

Construct New Storage Building at SUNY New Paltz. All work will be completed within 290 calendar days from receipt of the Notice to Proceed. The Fund's project specific goals for this project are 10% MBE and 10% WBE and 3% SDVOB. See Section 00 21 13 30 MWBESDVOB Utilization Plan Instructions dated Nov 2023. Utilization Plans shall be accepted in the ONLINE FORMAT ONLY using the Fund's web-based application; any other form of submittal will be rejected. The Fund reserves the right to reject any or all bids. Bids must be submitted in duplicate in accordance with the instructions contained in the Information for Bidders. A Bid Security will be required for each bid in an amount not less than five (5) percent of the Total Bid. To provide for an efficient bid opening, do not include documents other than your Proposals and securities in your bid envelope. It is the policy of the State of New York and the Fund to encourage minority and women-owned business enterprise participation in this project by contractors, subcontractors and suppliers. All bidders are expected to cooperate in implementing this policy. Please be advised that the Fund's insurance requirements are contained in Schedule A of Attachment A of the Construction Agreement. All insurance must be provided by companies approved by the Fund and be either licensed (admitted) by the New York State Department of Financial Services (NYS DFS) to issue insurance in the State of New York or authorized by NYS DFS and have an A.M. Best Company rating of "A-" Class "VII" or better. All successful bidders will be required to furnish a Performance Bond and a Labor and Material Bond pursuant to State Finance Law for 100% of the amount of the Contract. Bid date notes: Each bid must be identified, on the outside of the envelope, with the name and address of the bidder and designated a bid for the Project titled above. When a sealed bid is placed inside another delivery jacket, the bid delivery jacket must be clearly marked on the outside "BID ENCLOSED". Proposals that are mailed to the Fund must be delivered by 1:00 p.m. on the day of the scheduled bid opening and mailed Proposals must be sent using a delivery method that provides tracking and locating the Proposal. The Fund assumes no responsibility for any Proposal that is not delivered to the aforesaid address by 1:00 p.m. on the bid opening date. See Section 3 of the Information for Bidders for additional instructions regarding proposals, including modifications. Please be advised that all individuals who access the H. Carl McCall SUNY Building to submit bids or attend bid openings will be required to present picture identification to building security officials and obtain a visitor's pass prior to entering the building. Bidder's arriving prior to 12:30 PM on the bid opening date may be asked to wait outside the building. There is no parking available for bidders at the H. Carl McCall SUNY Building and violators may be towed. Doc Notes: Plans will be available on March 17, 2025 from Camelot Print & Copy Center (the Printer) 630 Columbia Street Extension, Latham, New York 12110 in either electronic or paper format. Bidders will be able to view the project online at the Printer's website. Bidders who register as a planholder through the Printer may acquire the bidding and contract documents using the following options: 1. For a fee of ten dollars($10), interested firms may request and receive an electronic download of the bidding and contract documents. At the bidder's expense, purchase a printed copy or copies of the bid set. 2. For a fee of ten dollars ($10), interested firms may request and receive a CD with electronic copies of the bidding and contract documents. At the bidder's expense, purchase a printed copy or copies of the bid set. 3. For a fee of $49, interested firms may request and receive a printed copy of the complete set. An electronic download or copy on CD will not be provided. The Estimatedrange is one million to 2.5 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Warehouse / Distribution

$2,500,000.00

Public - State/Provincial

New Construction, Site Work

37

25

2

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Scheduling of Work, Construction Progress Schedule, Periodic Work Observation, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Structural Panels
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Roof Accessories, Joint Protection, Joint Sealants, Expansion Control, Expansion Joint Cover Assemblies
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Ceilings, Flooring, Resilient Flooring, Wall Finishes, Stone Facing, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards, Panelboards, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Excavators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
484
Active Projects
278
Bidding Soon
4,430
All Active Projects
2,082
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

May 16, 2025

img_map_placeholder

1 Hawk Dr, New Paltz, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construct New Storage Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.