Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 16, 2025 at 8:00 PM
Updated May 17, 2025
Site work and paving for a road / highway in Arcadia, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Counties : Desoto, Glades, Hardee, Henry & Highlands Call Order: 003 Road Name: Shoulder Rework with Sod Limits: Midpoint Project(s): 43792917289(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: Description: The work under this Contract consists of Shoulder Rework With Sod. Question Deadline 04/10/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 003 - Shoulder Repair with Sod - Desoto, Glades, Hardee, Henry & Highlands SCOPE OF WORK - INTENT OF CONTRACT. (REV 2-15-17) (FY 2024-25) ARTICLE 4-1 is deleted and the following substituted: 4-1 Intent and Scope. The work under this Contract consists of SHOULDER REPAIR WITH SOD. The summary of pay items for this project is listed in the Bid Price Proposal. Pay item quantities shall replace "plan quantities" in all instances in the Contract Documents and will be determined by calculation in accordance with 9-1.3.1 regardless of designation elsewhere.
Award
Roads / Highways
$243,592.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2025
May 19, 2025
Multiple Locations, Arcadia, FL
Related To This Project
Arcadia, FL
Bid Date: Apr 28 2025
Arcadia, FL
Bid Date: Apr 25 2025
Arcadia, FL
Bid Date: May 20 2025
Arcadia, FL
Bid Date: Mar 01 2019
Arcadia, FL
Bid Date: Jun 05 2025
Arcadia, FL
Bid Date: Jun 16 2025
Arcadia, FL
Bid Date: Jun 10 2025
Arcadia, FL
Bid Date: Aug 05 2025
Arcadia, FL
Bid Date: Apr 16 2025
Arcadia, FL
Bid Date: Mar 27 2025
Arcadia, FL
Bid Date: Mar 20 2025
Arcadia, FL
Bid Date: Mar 20 2025
Arcadia, FL
Bid Date: Feb 19 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
