BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2025 at 8:00 PM

Updated May 17, 2025

Site work and paving for a road / highway in Arcadia, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Counties : Desoto, Glades, Hardee, Henry & Highlands Call Order: 003 Road Name: Shoulder Rework with Sod Limits: Midpoint Project(s): 43792917289(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: Description: The work under this Contract consists of Shoulder Rework With Sod. Question Deadline 04/10/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 003 - Shoulder Repair with Sod - Desoto, Glades, Hardee, Henry & Highlands SCOPE OF WORK - INTENT OF CONTRACT. (REV 2-15-17) (FY 2024-25) ARTICLE 4-1 is deleted and the following substituted: 4-1 Intent and Scope. The work under this Contract consists of SHOULDER REPAIR WITH SOD. The summary of pay items for this project is listed in the Bid Price Proposal. Pay item quantities shall replace "plan quantities" in all instances in the Contract Documents and will be determined by calculation in accordance with 9-1.3.1 regardless of designation elsewhere.

Award

Roads / Highways

$243,592.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
120
Bidding Soon
2,047
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

May 19, 2025

Project location map

Multiple Locations, Arcadia, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.