Site work and paving for a mixed-use development in Hazelwood, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Please direct any inquiries to Nikki Miller, Community Development Coordinator, at mmmiller@hazelwoodmo.org or (314) 513-5031. SCOPE The scope of this project is to remove and replace approximately 3,403 square yards of 7-inch concrete pavement street slabs, approximately 2,230 square yards of 10-inch concrete pavement street slabs, and three (3) grated trench drains located on Barnwood Drive, English Oak Drive, and Hazelwest Drive. The City reserves the right to add or delete quantities to stay within budget. Unless otherwise specifically stated in the Contract documents and technical specifications, the Contractor shall provide and pay for all bonds, insurance, permits, inspections, licenses, materials, labor, tools, equipment, light, power, water, heat, transportation, testing, supervision, utility connection fees and other facilities necessary for the execution and completion of work. If the Contractor, in the course of the work, finds any discrepancy between the specifications and physical conditions of the locality, or any error or omission in the specifications, shall immediately inform the Project Development Coordinator, in writing, and the Project Development Coordinator shall promptly verify the same. Any work done after such discovery, until authorized, will be done at the Contractor's risk. All work shall comply with the St. Louis County Highways and Traffic Standard Specifications for Road and Bridge Construction Manual. The Contractor shall deliver all improvements embraced in this Contract, complete in every respect, within the specified time. The Contractor shall at all times carry on the work in such a manner as to minimize the interference with traffic, utility and municipal services, and adjoining property owners', egress, ingress and use of their property. The work shall be carried out in such a manner that all physical structures and natural features are restored to at least as good of condition as they were in before the work was done. It is understood that where specifications apply, their provisions shall determine the character and manner of restoration of existing structures and features. The Contractor shall repair any damage, outside of the scope of work, done to private or public property to the satisfaction of the Owner of said property and the Contractor thereof shall absorb the cost. The alignment and grade of all utilities and services must remain as they now exist. It is in recognition of this requirement that these items must be accurately located well in advance of excavation and construction. If the Contractor causes damage to utilities due to their own neglect or failure to properly locate these structures in advance of excavation or for any other reason of their own neglect or carelessness, the charges made by the owners of the utilities for necessary repairs and replacement shall be borne by the Contractor. - 3 - The square yard measurements will be determined after placement of sub-base material and concrete. The term of this contract shall commence after written notice to proceed and terminate 45 calendar days after notice to proceed. Anticipated start date shall be May 12, 2025. Work shall be completed no later than June 30, 2025. Questions concerning this project shall be directed to Nikki Miller, Community Development Coordinator, at (314) 513-5031.
Award
Roads / Highways
$442,362.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 7, 2025
May 12, 2025
Multiple Locations, Hazelwood, MO
Related To This Project
Hazelwood, MO
Bid Date: Apr 28 2025
Hazelwood, MO
Bid Date: Jun 04 2025
Hazelwood, MO
Bid Date: May 28 2025
Hazelwood, MO
Bid Date: Aug 11 2025
Hazelwood, MO
Bid Date: Sep 11 2025
Hazelwood, MO
Bid Date: Dec 04 2025
Hazelwood, MO
Bid Date: Oct 27 2021
Hazelwood, MO
Bid Date: Mar 05 2025
Hazelwood, MO
Bid Date: Feb 18 2025
Hazelwood, MO
--
Hazelwood, MO
Bid Date: Sep 04 2024
Hazelwood, MO
Bid Date: May 22 2024
Hazelwood, MO
Bid Date: May 03 2024
Hazelwood, MO
Bid Date: May 03 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.