BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2025 at 8:00 PM

Updated April 23, 2025

Site work and paving for a road / highway in Mount Sterling, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Resurfacing, Repairs, and Reconstruction of Various City Streets. The City of Mt. Sterling, Kentucky reserves the right to reject any and all bids, regardless of cause. . Clay Street - 880 ft total length (North Maysville Street through North Sycamore St. intersection) a. 880ft I x 22ft w 2 indepth = 250 tons -Surface b. 880ft I x 22ft w 2 indepth = 250 tons - Milling 2. Howard Avenue - 645 ft total length of street a. 645ft I x 24ft w 2 indepth = 200 tons -Surface b. 645ft I x 24ft w 2 indepth = 200 tons -Milling 3. North Sycamore Street -430 ft total length (Clay Street to Holt Avenue) a. 430ft I x 24ft w 2 indepth = 140 tons - Surface b. 430ft I x 24ft w 2 indepth = 140 tons - Milling 4. Winn Street - 905 ft total length (North Maysville Street to North Sycamore St. intersection) a. 905ft I x 24ft w 2 indepth = 280 tons -Surface b. 905ft I x 24ft w 2 indepth = 280 tons - Milling 5. Bigstaff Court -450 ft total length of street c. 450ft I x 20ft w 2 in depth = 120 tons -Surface d. 450ft I x 20ft w 2 in depth = 120 tons - Milling 6. Holt Avenue -1925 ft total length of street a. 1925ft I x 24ft w 2 in depth = 595 tons - Surface b. 1925ft I x 24ft w 2 in depth = 595 tons - Milling

Award

Roads / Highways

$210,980.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
64
Bidding Soon
1,065
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

April 28, 2025

Project location map

Multiple Locations, Mount Sterling, KY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.