BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated April 1, 2025

This is a service / maintenance or supply contract in Hanalei, Hawaii. Contact the soliciting agency for additional information.

UPDATE: 26 March 2025. Attached PDF FA521525R0004 Kokee Asbestos Testing QAs. This identifies what questions were received and provides the Government's response. Drawings and floor plans are included in this attachment. Please see attached RFQ document and its attachments in addition to this description. This is a Request for Quote. We are seeking eligible vendors to provide quotes for the below: The Contractor will undertake a comprehensive assessment and sampling procedure, which includes ACM (Asbestos-Containing Materials) testing for buildings 1, 5, 10, and 14100, with a total area of approximately 20,000 square feet. Adequate sampling will be conducted on the floors, walls, pipes, ceilings to ensure the government receives thorough and accurate information for each facility. Contractor will ensure adequate testing is done in the upstairs support section room, downstairs radar tech offices, kitchen/common area, and the bedrooms of building 1 and the results for these areas should be specifically denoted in the report. See attached for a Map of the buildings. The below reports shall be submitted to the government within 15 business days of the contractor having acess to the installation. These reports are: Asbestos Inspection Report: A detailed report of the inspection findings, including the locations and conditions of asbestos-containing materials (ACMs). Laboratory Analysis Reports: Results from bulk sampling and laboratory analysis, including Polarized Light Microscopy (PLM) analysis. Asbestos Abatement Plan: If abatement is required, a plan outlining the procedures and safety measures to be followed. Chain of Custody Forms: Records of the handling and transportation of asbestos samples. Updated Asbestos Management Plan: Revised plan reflecting the current status of ACMs in the building. Email is the preferred means of communication for all responses to this solicitation. Please provide any questions to the POCs by 12:00 PM (HST) 25 March 2025.

Post-Bid

Military

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
1
Bidding Soon
76
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2025

April 30, 2025

Project location map

Multiple Locations, Hanalei, HI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.