Published April 9, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Westwood, Massachusetts. Completed plans call for the renovation of a educational facility.

A. Replace Federal Pacific brand electrical panels. The equipment and many panels appear original to the building and are beyond their useful life. All existing branch wiring powered from existing electrical panels in the boiler room will be extended and rerouted to the new electrical panels. The existing electrical panel enclosures will be used as splice boxes. B. The Work of the Project is defined by the Contract Documents and consists of the following 1. The Contractor will provide a new 120/208v 800amp 3phase 4wire underground electrical service to replace the existing 120/208volt 3phase 4wire 600amp underground electrical service. 2. The existing electrical service and equipment will remain while the new service and equipment are installed to help minimize downtime. However, some downtime is to be scheduled and approved when disconnecting the old and connecting the new service. 3. The new electrical service will be routed from an existing utility pole located adjacent to the parking lot to a new 800amp main breaker distribution panel located in basement storage room. 4. All existing electrical panelboards manufactured by Federal Pacific that are located in the boiler room will be replaced and replaced panelboards moved to the Storage Room as salvage. 5. Federal Pacific electrical panels located in other parts of the building will be replaced in kind. 6. A new drain pan located over new electrical panels and directly under existing piping with leak detection and alarms. 7. A new temperature controlled in-line exhaust fan and associated duct work, duct accessories, and controls to serve new Electrical Room and adjacent Work Room. 8. The Contractor will be responsible for relocation of existing overhead mechanical/plumbing piping routed through the storage room to maintain electrical equipment clearances. C. Type of Contract 1. Project will be constructed under a single prime contract. Sheehan Elementary School - Replace Electrical Services and Panels The community shall make positive efforts to achieve a goal of 7.18 percent participation of Minority-owned Business Enterprise(s) and 5.77 percent participation of Woman-owned Business Enterprise(s) within Professional Services contracts which are funded through financial assistance under this Agreement. Sheehan School - Replace Electrical Services & Panels. Electrical and Mechanical Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.

Sub-Bidding

Educational

$530,000.00

Public - City

Renovation

13

15

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Barriers and Enclosures, Temporary Barricades, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Access Doors and Frames, Windows
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Gypsum Board, Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
249
Bidding Soon
3,045
All Active Projects
1,395
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

May 15, 2025

img_map_placeholder

549 Pond St, Westwood, MA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sheehan School - Replace Electrical Service and Panels - Sub Bid

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.