Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 6, 2025 at 8:00 PM
Updated May 7, 2025
Site work and paving for a mixed-use development in Corcoran, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
**As of May 06, 2025, the project was awarded to Asphalt Surface Technologies Corp (Astech Corp), with an awarded amount of $261,895.41.** The work, in accordance with Drawings and Specifications prepared by Stantec Consulting Services Inc., consists of the following major items of work and approximate quantities: 840 Square Yards Mill Bituminous Pavement 1,450 Square Yard Geotextile Fabric, Type V Non-Woven 40 Tons Select Granular Borrow Mod 8% (CV) 810 Tons Aggregate Base, Class 5 760 Tons Bituminous Pavement 120 Lineal Feet Curb and Gutter 112 Square Feet Concrete Sidewalk 55 Lineal Feet Storm Sewer Pipe 3,600 Lineal Feet Pavement Markings Together with selective demolition, traffic control, erosion controls, seeding, and other related appurtenances. All plan holders who order electronic proposals through online will receive addenda as they are released; however, it is the Contractor's full responsibility to ensure they have received all addenda prior to the submittal of bids. Question Deadline 04/09/2025 Direct inquiries to Steve Hegland at (763) 479-4237 or steven.hegland@stantec.com or Nick Wyers at (763) 479-5174 or nick.wyers@stantec.com. No oral interpretation will be made to any bidder as to the meaning of the Specification or of the Drawings incorporated therein by reference or otherwise. Every request for such an interpretation shall be made in writing to: Steve Hegland, P.E. Stantec Consulting Services Inc. One Carlson Parkway North Suite 100 Plymouth, Minnesota 55447 Email: steven.hegland@stantec.com Or Nick Wyers, P.E. Email: nick.wyers@stantec.com Any inquiry received five (5) or more calendar days The intent of the Contract Documents is to prescribe a complete project of work or improvement. The Contract shall be based upon and include by reference the Contract Documents, and all addenda as herewith provided; all bids must be based upon a full compliance of the Contract Documents. Should there be some item or items not shown on the Drawings or described in the Specifications which are required for the Work, these items and the furnishing of all related labor, materials and equipment shall be considered incidental to the Work and no additional compensation will be provided
Award
Roads / Highways
$261,895.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 14, 2025
July 3, 2025
Multiple Locations, Corcoran, MN
Related To This Project
Corcoran, MN
Bid Date: May 14 2025
Corcoran, MN
Bid Date: May 28 2025
Corcoran, MN
Bid Date: May 28 2025
Corcoran, MN
Bid Date: Jul 25 2025
Corcoran, MN
Bid Date: Jul 31 2025
Corcoran, MN
Bid Date: Aug 20 2025
Corcoran, MN
Bid Date: Oct 14 2025
Corcoran, MN
Bid Date: Mar 26 2019
Corcoran, MN
Bid Date: Jun 11 2024
Corcoran, MN
Bid Date: Jun 11 2024
Corcoran, MN
Bid Date: Jun 11 2024
Corcoran, MN
Bid Date: Apr 23 2024
Corcoran, MN
Bid Date: Apr 09 2024
Corcoran, MN
Bid Date: Apr 09 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
