BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2025 at 8:00 PM

Updated May 30, 2025

Site work and paving for a mixed-use development in Corcoran, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

City Park Improvements The Work, in Accordance With Drawings and Specifications Prepared by Stantec Consulting Services Inc., Consists of the Following Major Items Of Work and Approximate Quantities: 1 Ls Clearing and Grubbing 21,000 Cy Common Excavation 3,000 Cy Common Embankment 1,600 Lf Storm Sewer Pipe 1,100 Lf Watermain/water Service Pipe 1,300 Lf Sanitary Main/sanitary Service Pipe 5,600 Tn Aggregate Base 6,800 Tn Select Granular Borrow 2,700 Tn Bituminous Pavement 14,000 Sf Concrete Walk 3,200 Lf Concrete Curb and Gutter 6 Ea Parking Lot Lights. Together With Selective Demolition, Traffic Control, Erosion Control, Landscaping, Seeding, and Other Related Appurtenances. Each Bid Proposal Shall Be Accompanied by a "bid Security" in the Form Of a Certified Check Made Payable to the "city of Corcoran" (Owner) in The Amount Not Less Than Five Percent (5%) of the Total Bid, or a Surety Bond in the Same Amount, Running to the Owner, With the Surety Company Thereon Duly Authorized to Do Business in the State of Minnesota. Such Bid Security to Be a Guarantee That the Bidder Will Not, Without the Consent of the Owner, Withdraw Their Bid for a Period of Ninety (90) Days After the Opening of Bids, and if Awarded a Contract, Will Enter Into A Contract With the Owner; and the Amount of the Certified Check Will Be Retained or the Bond Enforced by the Owner in Case the Bidder Fails To Do So. All Bid Securities Except Those of the Three Lowest Bidders Will Be Returned Within Five Days After the Opening of Bids. Eligible Bidders for This Project Must Meet the Minimum Criteria as Defined in the Section 00 45 49 Responsible Contractor Law in Accordance With Minnesota Statutes 16c.285, Subdivision 3, and Additional Criteria Required by the Owner. Direct Inquiries to Mark Schroeher at (651) 395-5216 or Mark.schroeher@stantec.com. Mark Schroeher, Project Engineer Stantec Consulting Services, Inc. Bid Proposals Shall Be Submitted on Forms Furnished for That Purpose. Bids Shall Be Submitted Electronically Through the Questcdn Website in Accordance With the Instructions to Bidders. No Bidder Shall Withdraw Their Bid, Without the Consent of the Owner, for the Period of Days Indicated Above After the Date for the Opening Thereof. The Owner, However, Reserves the Right to Reject Any or All Bids and to Waive Any Minor Irregularities, Informalities or Discrepancies. A Work History Detailing Qualifications and Past Experience Must Be Provided Upon Request. A. Work of this Contract comprises general construction including, but not limited to, bituminous, concrete, excavation, clearing and grubbing, removals, storm sewer, draintile, sanitary utility, water utility, grading, aggregate base, signage, planting, seeding and erosion control, and pavement markings in Hennepin County, City of Corcoran. B. Work in this contract includes the major work items and approximate quantities as listed in the Advertisement for Bids. C. It is the intent of the Project Manual to cover all aspects of the Project. Should there be some item or items not shown on the Drawings or not described in these Specifications which are required for the Work, those items and the furnishing of all labor, materials, and equipment shall be considered incidental to the Work and no additional compensation will be provided. D. The Work includes the furnishing of all labor, equipment, tools, machinery, materials, and other items required for the construction of a complete Project as specified. Equipment furnished shall be in safe operating condition and of adequate size, capacity, and condition for the performance of the Work. CONTRACTOR shall obtain all measurements necessary for the Work and shall be responsible for establishing all dimensions, levels, and layout of the Work. E. CONTRACTOR shall be solely responsible for the coordination of its activities with regard to the Project and the activities of SUBCONTRACTORS and OWNER. F. Where laws or requirements of public authority prescribe a higher standard/requirement, then the higher standard/requirement prescribed shall supersede the provisions of this document. Any inquiry received seven (7) or more calendar days (deadline is May 20, 2025) prior to time for opening of bids will be considered

Bid Results

Roads / Highways

$1,797,413.00

Public - City

Paving, Site Work

71

19

48

7

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
318
Active Projects
187
Bidding Soon
1,563
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

June 26, 2025

Project location map

20200 County Rd 50, Corcoran, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.