BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2025 at 8:00 PM

Updated April 3, 2025

Site work for a playground / park / athletic field in Wheat Ridge, Colorado. Completed plans call for site work for a playground / park / athletic field.

Reference Number 0000380970 Delivery Point: Prospect Park 11600 W 44th Ave Wheat Ridge, CO 80033 Description/ Specifications/ Scope of Work: Objectives: o Install flow magmeters for two irrigation pumps. o Replace a submersible level transmitter to monitor lake levels. o Implement telemetry to allow real-time data access and alerts. o Ensure equipment compatibility with existing infrastructure. Scope of Work: 1. Water Meter Requirements 1. Supply and install two water flow magmeters, each designed to fit the pipes connected to the current irrigation pumps. The meters must accurately measure low to high water flow ranges (0-300 GPM range, low, include an on-site display for manual readings and fit within the pipe space available near each pump. 2. Power is available at each installation sites. 3. Meter must be an approved meter by the Colorado Division of Water Resources, local water commissioner and/or the local tributary Manager. 2. Telemetry Requirements 1. Meters must support remote data transmission through text, email, and a software platform. The software platform should allow real-time access and store historical data. Reporting schedules must be configurable to send readings at set intervals. This data has to meet the accounting and reporting requirements with the State Water Commissioner as well as local city and public water measuring partnerships. 3. Submersible Level Transmitter Replacement 1. Replace the existing lake-level transmitter with one that fits current infrastructure or propose a new installation method. 2. The new transmitter must: 1. Include telemetry with customizable reporting. 2. Display water levels visually on-site. 3. Integration with the same data platform as the flow meters is preferred. 4. Future Upgrade Capability 1. All equipment must support potential upgrades to more advanced monitoring systems. 5. Ease of Configuration and Access 1. Equipment settings should be easily adjustable without requiring specialized equipment. Smartphone access via Bluetooth or a mobile app is preferred. 6. Vendor Support and Telemetry Subscription: 1. Include subscription plans for telemetry services, with vendor support for troubleshooting. Timely vendor response is essential to minimize downtime. 7. Installation, Training, and Warranty 1. The vendor is responsible for complete installation, including any required electrical work. 2. Must provide training for staff, warranties on equipment and installation, and ongoing technical support. This project seeks to procure and install flow meters and a level transmitter to monitor non-potable lake water usage for irrigation. The goal is to enhance water flow accuracy, enable reliable data reporting, and prepare for future system upgrades. Objectives: Install flow magmeters for two irrigation pumps. Replace a submersible level transmitter to monitor lake levels. Implement telemetry to allow real-time data access and alerts. Ensure equipment compatibility with existing infrastructure.

Post-Bid

Playgrounds / Parks / Athletic Fields

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
108
Bidding Soon
1,229
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2025

April 30, 2025

Project location map

11600 W 44th Ave, Wheat Ridge, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.