BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 4, 2025 at 8:00 PM

Updated April 5, 2025

Site work for a mixed-use development in Tigerton, Wisconsin. Completed plans call for site work for a development.

Description: The Project includes the following Work: Dredging, dewatering, hauling and disposal of approximately 9,300 CY of the Upper Tigerton Pond. Work also includes clearing & grubbing, temporary access, erosion control and site restoration. The anticipated start date is June 15, 2025, substantial completion date is August 15, 2025 and final completion date is August 29, 2025. Additional Description: No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with the wage rate scale established by local wage rates. Owner reserves the right to waive any informalities or to reject any or all bids. A pre-bid conference will not be conducted for this Project. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Dan Rammer, PE, (920) 931-0095, drammer@msa-ps.com 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Bid Results

Conservation and Development

$1,222,900.00

Public - City

Site Work

15

14

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
34
Bidding Soon
555
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

June 15, 2025

Project location map

To Be Determined, Tigerton, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.