BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 22, 2025 at 8:00 PM

Updated May 23, 2025

Renovation of a laboratory facility in Columbus, Ohio. Completed plans call for the renovation of a laboratory facility.

This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director's Office. EDGE Participation Goal: 5% of contract DOMESTIC STEEL USE IS REQUIRED PER ORC 153.011. The time for Substantial Completion of all Work is 120 consecutive days from the Notice to Proceed. The Board of Trustees of The Ohio State University reserves the right to waive any informalities or to reject any or all bids.

Bid Results

Laboratories

$399,238.00

Public - State/Provincial

Renovation

27

41

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
94
Bidding Soon
1,980
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

May 15, 2025

Project location map

181 Taylor Ave, Columbus, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.