Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 26, 2025 at 8:00 PM
Updated June 27, 2025
Site work for a water / sewer project in Griffin, Georgia. Working plans call for site work for a water / sewer project.
Description Soliciting proposals from qualified vendors experienced in the design, supply, installation, implementation and support of an Advanced Metering Infrastructure Solution (AMI) for our electric utility, with planned future capability for our water utility (five or more years from now for water implementation). This solution mustin corporate the following: real-time usage monitoring, improved safety, energy theft prevention, responsive customer support, reporting, and data flow integration with existing City systems. Questions due Monday April 14, 2025 Direct all questions to the following email address: Email: afmeeks@cityofgriffin.com The City currently has an Itron cloud-hosted electric AMI solution, with Itron electric meters. We are requesting the submission of proposals from qualified vendors to provide an on-premise AMI solution, along with electric meter installation services, as a replacement. As currently envisioned, the proposed solution should include the following: Provide real-time data collection in support of enhanced customer service Support full two-way communication between the City and the customer meter Enable service to be disconnected and re-connected at the customer premise, remotely where applicable Support cost-effective delivery of electric services Take advantage of new customer fiber service to improve electric services at customer premises Integration with the City's existing CIS/billing, GIS, Outage Management and Customer Portal Systems AMI system testing AMI solution training Maintenance and support
Final Planning
Water / Sewer
$100,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
10
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 16, 2025
September 16, 2025
Multiple Locations, Griffin, GA
Related To This Project
Griffin, GA
Bid Date: Apr 04 2025
Griffin, GA
Bid Date: Apr 16 2025
Griffin, GA
--
Griffin, GA
Bid Date: May 16 2025
Griffin, GA
Bid Date: Jun 12 2025
Griffin, GA
Bid Date: May 23 2025
Griffin, GA
--
Griffin, GA
Bid Date: Apr 15 2025
Griffin, GA
Bid Date: Apr 22 2025
Griffin, GA
Bid Date: Mar 28 2025
Griffin, GA
Bid Date: Mar 25 2025
Griffin, GA
Bid Date: Mar 28 2025
Griffin, GA
Bid Date: Mar 04 2025
Griffin, GA
Bid Date: Mar 03 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
