Published June 26, 2025 at 8:00 PM

Updated June 27, 2025

Site work and paving for a road / highway in Griffin, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City of Griffin (City) is seeking bids from qualified organizations to provide materials, equipment, labor and services necessary (including traffic control) for milling, resurfacing and striping work on approximately6.08 miles of street in the City. For any bid as required and noted in Section 1 of this bid document, a one hundred ten percent (110%) Performance bond and a one hundred ten percent (110%) Payment bond shall be furnished payable to, in favor of, and for the protection of the City. When Bid bonds are required, they must be in a sum equal to five percent (5%) of the total amount of the supplier's response and may be in the form of a surety issued bond or cashier's check made payable to the City of Griffin All work shall be commenced within fifteen (15) days of the Notice to Proceed and shall be completed within ninety (90) calendar days thereafter, unless otherwise specified. Bonds required: Yes, Performance/Payment Bonds ONLY are required prior to contract For all questions about this Bid contact: April Meeks afmeeks@cityofgriffinc.com Questions due : Tuesday, June 3, 2025 by 2:00 p.m. The City reserves the right to: a) reject any and all submittals received outside the time/place stated in the notice; b) reject any submittals which show omissions, irregularities, alteration of forms or unsolicited responses; c) waive any minor technicalities of form, or formalities of the responses without prejudice to other responses; d) reject any or all bids or any part thereof; e)obtain clarification on any point in a respondent submittal or obtain additional information; f) accept the bid that is in the best interest of the City, regardless of whether or not it is the lowest bid; g) award the bids received on the basis of individual items or on the entire list of items. The City also reserves the right to cancel this bid at any time and will not be liable for any cost/losses incurred by the Supplier throughout this process. The Successful Bidder shall perform the resurfacing and striping. Removal and disposal of waste asphalt and dirt shall be the responsibility of the Supplier and at no additional cost to the City. All millings are the property and belong to the City of Griffin. 1.3.2.2. The Successful Bidder shall be responsible for the clearing of right-of-way obstructions (if any) as part of the work to be performed.

Award

Roads / Highways

$2,110,643.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
171
Bidding Soon
2,341
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

August 11, 2025

Project location map

Multiple Locations, Griffin, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.