BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 3, 2025 at 8:00 PM

Updated June 4, 2025

This is a service / maintenance or supply contract in Griffin, Georgia. Contact the soliciting agency for additional information.

Statements of qualifications and proposals are being requested from Engineering Firms with a strong record in successfully assisting local governments with the preliminary report, final design, and construction administration of Federally Assisted Projects. Responding firms should be qualified to provide a Preliminary Engineering Report (PER), design and construction administration services for projects utilizing federal funds. Plans are to contract, within a year from the date of this notice, a reputable Engineering Firm for a Preliminary Report, Design and Construction Administration services for Federally Funded Projects related to community and economic development. This procurement could include Community Development Block Grants (CDBG), Employment Incentive Program (EIP) Projects, Georgia Environmental Facilities Authority (GEFA) Projects, Economic Development Administration (EDA) Projects, and any other federally funded project in compliance with 24 CFR 570.489(g). This procurement action may also lead to additional project contracts and/or contract addendums for Preliminary Engineering Report (PER), design and construction administration services, for State and Federally funded projects. This is not a request for retainer services. Immediate plans call for services to assist the City with the Preliminary Engineering Report, Design Services and Construction Administration Services for a Community Development Block Grant Project related to water, sewer, and drainage improvements. Submitting firms will be re-considered, on a project-by-project basis, should future federally funded opportunities arise in the next 24-month period from date of this notice. Information which should be submitted for our evaluation is as follows: 1) History of firm and resources 2) Federal Funds Engineering Experience, including HUD, EDA, etc. 3) Key personnel/qualifications 4) Current workload 5) Scope and level of service proposed 6) Experience with similar projects and list of references 7) Fee Percentages (if any) associated with the Engineering Report (PER), for the application, and Design and Construction Administration Services. If the City pursues a 2026 CDBG, the draft PER would be needed no later than December 31, 2025. 8) Errors and Omissions Insurance, please provide a copy. 9) Statement of Qualifications Form 10) Section 3 Certification Form (Only Submit with your Proposal if you are claiming Section 3 Status.) The immediate project is subject to Federal and State contract provisions prescribed by the Georgia Department of Community Affairs/and or other federal agencies listed above. The immediate project is covered under the requirements of Section 3 of the HUD Act of 1968, as amended and Section 3 Business Concerns are encouraged to apply. Future federal projects may not require Section 3 compliance. The City of Griffin also abides by the following laws as they pertain to HUD Assisted Projects: Title VI of the Civil Rights Act of 1964; Section 109 of the HCD Act of 1974, Title 1; Title VII of the Civil Rights Act of 1968 (Fair Housing Act); Section 104(b)(2) of the Housing and Community Development Act of 1974; Section 504 of the Rehabilitation Act of 1973 as amended; Title II of the Americans with Disabilities Act of 1990 (ADA); and the Architectural Barriers Act of 1968. Interested parties should request copies of the Statement of Qualifications Form and Section 3 Certification Form prior to preparing and submitting their proposal. We reserve the right to accept or reject any and all proposals and to waive informalities in the proposal process. Questions and proposal packages should be submitted to the name and address listed below: Michelle Haynes, Planning & Development Director City of Griffin P.O. BOX T Griffin, GA 30224 Phone: (770) 233-4130 Email: mhaynes@cityofgriffin.com. The method of Contractor Selection has not been Determined at this time.

Conceptual

Municipal

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
171
Bidding Soon
2,341
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 30, 2025

Project location map

Multiple Locations, Griffin, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.