BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 1, 2025 at 8:00 PM

Updated August 2, 2025

Demolition, site work and renovation of a municipal facility in Griffin, Georgia. Conceptual plans call for the demolition of a municipal facility; for the renovation of a municipal facility; and for site work for a municipal facility.

Spalding County is seeking Statements of Qualifications and Proposals from qualified General Contractors to provide preconstruction and construction management services for the Facade Stabilization, Demolition, and Renovation at 117 & 119 E. Solomon Street in Griffin, GA. Facade Stabilization involves the stabilization of the historic front building facade at 117 E. Solomon Street in Griffin, Georgia. The General Contractor shall provide limited destructive survey to assist the design team in preparing documentation showing demolition intent and performance criteria for the building stabilization. Demolition Services will occur after the facade stabilization process has begun and will provide demolition services for the remainder of the building behind the 117 E. Solomon facade. This will also include shoring and other measures to stabilize the masonry demising walls between 117 and the adjacent structures at 113 and 119 E. Solomon Street. The interior debris on the first and second floor will be removed through the rear entry. The work will also include removal of the debris at the first and second floors. The goal is to allow work installed during the stabilization process to be part of the permanent solution and avoid temporary work if possible. The scope may also include preconstruction services to assist the design team in budgeting for the rebuild of 117 and future renovation of 119, the existing County Annex offices. The County reserves the right to retain the selected General Contractor for preconstruction services with recommendations to the County and design team to encourage quality and efficiency. This scope of work would involve new building construction in the 117 E. Solomon space so the existing 119 Annex can remain functional during this time. Once the new construction in the 117 space is complete, County staff can relocate to the new construction so the renovation of the 119 Annex space may begin. Question Deadline 08/11/2025 at 4:00 PM ET Questions should be directed in writing to the Spalding County Purchasing Department, Mitzy Campbell, via email to: mcampbell@spaldingcounty.com. Issue responses to questions/requests for clarifications (this will include issuance of any Addenda) 08/14/25 C.O.B. The anticipated start date of work is September, 2025, contingent upon permit receipt and material procurement. A detailed schedule for Facade Stabilization and 117 Demolition will be required by the General Contractor as part of the RFP response deliverables. In addition to the overall project schedule a site logistics plan is recommended. The method of Contractor Selection has not been Determined at this time.

Project Abandoned

Municipal

$2,500,000.00

Public - County

Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
184
Bidding Soon
2,347
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

Project location map

117 E Solomon St, Griffin, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.