Site work and paving for a mixed-use development in Griffin, Georgia. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The OWNER of the project is Spalding County. The ENGINEER for the project is LJA Engineering, Inc. The approximate extent and character of the Work is generally described as follows: The project construction consists of re-grading 0.87 mile of existing dirt road to prepare for paving. The road is to be paved to a width of 22 feet utilizing GDOT approved binder course and topping course. The project will include driveway culvert replacements, driveway paving, and a culvert replacement using an aluminum box culvert and alternate for a pre-cast or cast-in-place double 10' x 8' box culvert. The time allowed for Substantial Completion is 240 days, and the time allowed for completion and readiness for final payment is 270 days from the date of commencement. Each Bid must be accompanied by a Bid Bond completed on the attached Bid Bond Form with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five (5%) of the total amount payable by the terms of the contract, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. Performance and Payment Bonds, each in an amount at least equal to 110 percent of the contract amount, and a Certification of Insurance will be required. A Certification of Insurance will be required from the low bidder prior to award of the Contract. All Bids will remain subject to acceptance for ninety days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. TITLE VI OF THE CIVIL RIGHTS ACT OF 1964, AS APPLIED THROUGH THE CIVIL RIGHTS RESTORATION ACT OF 1987 - The CITY OF GRIFFIN, GEORGIA, in accordance with Title VI of the Civil Rights Act of 1964, 42 U.S.C. 2000d to 2000d-4, as amended by The Civil Rights Restoration Act of 1987, hereby notifies all bidders that no person shall on the grounds of race, color, national origin, sex, age, and handicap/disability, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity conducted by the recipient regardless of whether those programs, services, and activities are federally-funded or not. Further, it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 23 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, sex, age, handicap/disabled in consideration for an award. Doc note: Digital versions of the Bidding Documents/Project Manual may be obtained for a non-refundable payment of $75.00. Bidder shall also provide a letter from the Surety Company verifying the Bidder has the bonding capacity as outlined for the project and that the Surety Company will bond projects for Contractor as outlined in the specifications. The OWNER is not obligated to consider a Bidder's proposal if Bidder is not on record with the Issuing Office as having received complete Bidding Documents/Project Manual from the Issuing Office. Question Deadline 10/08/2025 at 12:00 PM ET - Contractor questions regarding the bid should be directed to Jason Graham via email at jagraham@lja.com. All questions must be submitted in writing. The last day for contractor questions. The Owner reserves the right to reject any or all Bids, to waive formalities and re-advertise.

Bid Results

Roads / Highways

$2,002,298.00

Public - County

Paving, Site Work

115

9

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
184
Bidding Soon
2,347
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

November 13, 2025

Project location map

Pineview Rd, Griffin, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.