BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2025 at 8:00 PM

Updated April 18, 2025

Site work and paving for a mixed-use development in Davis, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work shall include In general, the work shall include mobilization, public notification, traffic control; hot-mix asphalt (HMA) patches and base repairs; concrete improvements, including curb ramp replacements for ADA compliance, sidewalk and curb and gutter repairs; bike and pedestrian path reconstruction requiring removal of asphalt concrete pavement and underlying subgrade materials; etc. **Pre-Qualified Contractors Only** Notice to Proceed This Project, if awarded, will be awarded for June 2025 start date. The Notice to Proceed shall be issued no sooner than June 2, 2025. For further information, contact Kevin Fong, PE, Principal Civil Engineer, KFong@cityofdavis.org. Questions will only be considered and answered via email. Questions will not be considered or answered 48 working hours prior to the bid opening. No Pre-Bid Conference is scheduled for this project. Bid Security Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the City Council, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to City of Davis as bid security. The bid security shall be provided as a guarantee that within five (5) working days after the City provides the successful bidder the Notice of Award, the successful Bidder will enter into a contract and provide the necessary bonds and certificates of insurance. The bid security will be declared forfeited if the successful Bidder fails to comply within said time. No interest will be paid on funds deposited with the City. The Bid Bond submitted shall be provided by a surety duly authorized by the Insurance Commissioner to transact surety business in the State of California. Performance Bond and Labor and Material Bond The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer time for completion FOR the base bid is 90 working days, and 15 working days will be added for each awarded add alternate

Bid Results

Roads / Highways

$1,266,000.00

Public - City

Paving, Site Work

18

13

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
370
Active Projects
122
Bidding Soon
2,827
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.