BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated April 26, 2025

Renovation of a municipal facility in Hillsville, Virginia. Completed plans call for the renovation of a 35,900-square-foot municipal facility.

Installation of Roof System. Reference-Twin County ESS Building at 494 Industrial Park Road, Hillsville, VA approx. 35,900 sq. ft. of Roof Area REQUIRED system with 20-year warranty. Mount Rogers Community Services is currently soliciting bids for roof system at Smyth ESS Building located at 494 INDUSTRIAL PARK DRIVE, HILLSVILLE, VA 24343. All Inquiries for Information Should Be Directed To: korey.kennedy@mountrogers.org Phone: (276) 239-0064____ Sections 1 and 2: o Furnish and Install Expanded Polystyrene Insulation board between raised flutes of metal panel roof system. o Mechanically attach 1" ISO Insulation cover board over EPS flute filler to provide a smooth rigid roof surface. o Mechanically attach single ply TPO roofing membrane per manufacturer's recommendations. o To Include a roof system manufacturer's 20 year no dollar limit. labor and material warranty. Install wood blocking as required at the eaves and rakes. o On Section 1 terminate at rake perimeter with 24ga prepainted metal gravel stop with continuous 22ga galvanized cleat. o On Section 1 terminate at the gutter edge with 24ga prepainted 11netal drip edge. o On Section 2 Install membrane up and over the parapet wall. o Fabricate and install new 24ga prepainted metal coping with continuous 22ga galvanized cleat. o Flash all walls, pipes, curbs, and other penetrations per roof manufacturer's specifications. o Clean up and remove project related debris. Section 3: o Remove and dispose of existing EPDM membrane and underlying insulation. o Furnish and install Expanded Polystyrene insulation board between raised flutes of metal panel roof system. o Mechanically attach 1" ISO insulation cover board over EPS flute filler to provide a smooth rigid roof surface. o Mechanically attach single ply TPO roofing membrane per manufacturer's recommendations. o To include a roof system manufacturer's 20-year-old no dollar limit, labor and material warranty. Install wood blocking as required at the eaves. o Terminate at the gutter edge with 24ga prepainted metal drip edge. o Install membrane up and over the parapet walls. o Fabricate and install new 24ga prepainted metal coping with continuous 22ga galvanized cleat. o Flash all walls, pipes, curbs, and other penetrations per roof manufacturer's specifications. Clean up and remove project related debris.

Post-Bid

Municipal

$600,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
94
Bidding Soon
1,070
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2025

May 26, 2025

Project location map

494 Industrial Park Dr, Hillsville, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.