BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Site work and paving for a mixed-use development in Richfield, Minnesota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reconstruct Penn Avenue (CSAH 32) from 75th Street to the Crosstown (Trunk Highway 62) eastbound ramps in the City of Richfield. Purpose & Description: The existing roadway is nearing the end of its useful life and warrants replacement. The segment extending from 75th Street to 66th Street (CSAH 53) was last reconstructed in 1964, whereas, the segment extending from 66th Street (CSAH 53) to Crosstown (TH 62) was last reconstructed in 1987. Routine maintenance activities, such as overlays, are no longer cost effective in preserving assets. Segments of the curb have experienced settling, diminishing their ability to collect water and define the roadway edge. In addition, much of the corridor lacks a consistent boulevard space, presenting uncomfortable conditions for people who walk, roll, and take transit (noting that Metro Transit Route 4 service currently operates along the corridor). The existing typical section generally includes a three-lane roadway with shoulder space available for people biking. The proposed project will improve the accessibility, mobility, and safety for people walking, using transit, biking, and driving through the implementation of proven Complete and Green Streets design strategies. The new roadway environment will be determined as part of the design process after extensive public engagement, data analysis, and environmental review. The project's scope is anticipated to include the replacement of deteriorated pavement, traffic signals, curb, and storm sewer structures. Specific safety improvements may include the installation of curb extensions and raised medians to calm traffic and improve the experience for people crossing. It is anticipated that multimodal elements such as dedicated bicycle facilities, sidewalk, ADA upgrades, and streetscaping will be explored as part of the project development process in order to improve the user experience for people walking, using transit, and biking along and across the corridor. As of March 27, 2025 ,This project is included in the County's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$14,830,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
0
Bidding Soon
820
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2028

Project location map

Penn Ave S, Richfield, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.