Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 27, 2025 at 8:00 PM
Updated March 28, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Minneapolis, Minnesota. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Replace existing Bridge #94282 along Glenwood Avenue (CSAH 40) over Bassett Creek in the City of Minneapolis. Purpose & Description: The existing bridge (built in 1889) consists of a masonry arch that is entirely buried underneath Glenwood Avenue (CSAH 40). The culvert is in relatively poor condition and has been classified as structurally deficient. Its masonry walls are showing signs of extensive deterioration that is allowing water to penetrate through the walls and floor of the structure. This structure is nearing the end of its useful life; therefore, a capital project is recommended as routine maintenance activities are no longer cost effective in extending its useful life. Additionally, this structure is located immediately above other storm and sanitary utilities; suggesting relatively complicated underground conditions. At this time, the specific type of improvement has not yet been determined. However, county staff will investigate options to preserve the existing structure as part of the project development process. An alternative to full replacement may be preferred as it offers a more cost effective investment, and also minimize disruptions to the travelling public. It is anticipated that any incidental pavement, sidewalk, and drainage elements disturbed by the project will be replaced in-kind. Without future improvements, the bridge structure will continue to deteriorate and require frequent maintenance and repair. As of March 27, 2025 ,This project is included in the County's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$3,440,000.00
Public - County
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2027
Glenwood Ave, Minneapolis, MN
Related To This Project
Minneapolis, MN
Bid Date: Apr 14 2025
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
Bid Date: May 08 2025
Minneapolis, MN
--
Minneapolis, MN
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
