BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated March 29, 2025

Site work, paving, new construction and addition to a bridge / tunnel in Minneapolis, Minnesota. Conceptual plans call for the addition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

UPDATE :Replace Bridge #27542 along Pioneer Trail (CSAH 1) over the Minnesota River Bluffs LRT Regional Trail in the City of Eden Prairie. Purpose & Description: The existing bridge (built in 1975) is classified as structurally deficient based on the condition of its primary structural elements. The current width is approximately 48' wide and provides one vehicle travel lane in each direction, along with a painted median and an approximately 8' wide shoulder on each side. The bridge superstructure consists of continuous steel beams that are aging, but are in relatively fair condition. The bearings supporting the superstructure are in very poor condition and restrict thermal movement. Since the bridge cannot expand and contract, the deck and beams have experienced accelerated wear and deterioration. This condition has reduced the anticipated service life of the structure. This project will provide a full replacement of Bridge #27542 over the Minnesota River Bluffs LRT Regional Trail. The configuration of the new bridge is anticipated to provide a dedicated space for multimodal users along the north side. This multimodal facility will connect to the Minnesota River Bluffs LRT Regional Trail that includes a trail entrance within close proximity to this bridge. Also, it's anticipated that this project will introduce adjustments to the roadway configuration to provide a dedicated left-turn lane for people driving who wish to access Trails End Road. Furthermore, it is anticipated that the new bridge will be designed to provide a 75-year (or greater) service life. This project was awarded federal formula funding through the Metropolitan Council's 2022 Regional Solicitation. Construction Q2 2026 - Q4 2026 Completion 2027 Project is in Hennepin County - Purchasing and Contract Services capital budget fy 2025-2029 CIP ____________________________________________________________________________________________________________ CSAH 1 - Replace Bridge #27542 over Mn River Bluffs LRT Trail Fiscal year 2024-2028 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$4,960,000.00

Public - County

Addition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
112
Bidding Soon
1,436
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2026

Project location map

Multiple Locations, Minneapolis, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.