Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 28, 2025 at 8:00 PM
Updated March 29, 2025
Renovation of a mixed-use development in Minneapolis, Minnesota. Conceptual plans call for the renovation of a municipal facility.
This project, located at the City Hall / Courthouse, at 350 S 5th Street in Minneapolis, Minnesota, will address the replacement of the fire alarm panel and all associated obsolete components thoughout the entire building. Purpose & Description: The fire alarm system at the City Hall is in need of replacement. The MBC is currently utilizing the Honeywell Gamewell Apollo system, which due to building code changes and is currently beyond expected life cycle, is now obsolete and cannot be serviced beginning in 2025. The City Hall building is broken down into two areas. They include the City Hall space that includes all spaces from the 3rd floor and below, and then the Hennepin County Sheriff's Adult Detention Center (ADC) on floors 4 & 5. For this project, the two areas of the building will coordinate to ensure the same components will be installed building-wide, which will provide an ease of maintenance in the future. The ADC will be using a Vesda addressable system with air sampling points. While the rest of the building will use velocity system with the photoelectric smoke detection. Both new systems will utilize the Honeywell Gamewell system Construction: May 2026 Completion: May 2027 (Includes lead time for materials) As of March 28, 2025 ,This project is included in the city's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Municipal
$500,000.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2026
350 S 5th St, Minneapolis, MN
Related To This Project
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Apr 16 2025
Minneapolis, MN
Bid Date: Apr 11 2025
Minneapolis, MN
Bid Date: May 20 2025
Minneapolis, MN
Bid Date: Apr 10 2025
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Apr 14 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
