BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 25, 2025 at 8:00 PM

Updated July 30, 2025

Demolition, site work, paving and new construction of a civil project in Stewartsville, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Question Deadline 07/22/2025 Submit completed Contractor Questionnaire seven (7) days prior to the date and hour of the bid opening. This contract requires payment of the prevailing hourly rate of wages for each craft or type of work required to execute the contract as determined by the Missouri Department of Labor and Industrial Relations, and requires adherence to a schedule of minimum wages as determined by the United States Department of Labor. For work performed anywhere on this project, the contractor and the contractor's subcontractors shall pay the higher of these two applicable wage rates. The applicable state wage rates for this contract are detailed in "Annual Wage Order 32", that is attached to this bidding document. The applicable federal wage rates for this contract are the effective Davis-Bacon federal wage rates posted the tenth day before the bid opening date and can be found at. These supplemental bidding documents have important legal consequences. It shall be conclusively presumed that they are in the bidder's possession, and they have been reviewed and used by the bidder in the preparation of any bid submitted on this project. The proposed work includes: Demolition of an existing bridge and the construction of a new 101-foot single span prestressed concrete NU girder bridge. Guardrail, riprap, and permanent erosion control will be installed along with any other incidental work in accordance with plans and specifications. A certified cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. The DBE Goal for this project is 5%. The Clinton County Commission reserves the right to reject any or all bids.

Post-Bid

Bridges / Tunnels

$750,000.00

Public - County

Demolition, New Construction, Paving, Site Work

26

6

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
102
Bidding Soon
1,187
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2025

August 28, 2025

Project location map

NW 348th St, Stewartsville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.