Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 16, 2025 at 8:00 PM

Updated April 17, 2025

Site work for a mixed-use development in Allouez, Wisconsin. Completed plans call for site work for a road / highway; sidewalk / parking lot; and water / sewer project.

The work under this contract shall consist of the removal and replacement of the East River Drive watermain to include inlet protection, removing asphalt, removing curb & gutter, removing & abandoning watermain, watermain, water services, temporary traffic control, and all incidental items necessary to complete the work as shown on the plans and included in the specification manual. Est. Completion Date: July 18, 2025 Pre-Qualification: Yes

Award

Roads / Highways

$176,112.00

Public - City

Site Work

10

10

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
33
Bidding Soon
589
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2025

May 14, 2025

Project location map

E River Dr, Allouez, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed