Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 7, 2025 at 8:00 PM
Updated May 10, 2025
Renovation of an educational facility in Brandon, Manitoba. Completed plans call for the renovation of a educational facility.
Comply with the requirements of this section when performing the following work, as outlined in Section 02 82 00 - Asbestos Abatement - Summary of Work, and applicable drawings to confirm locations and approximate quantities of asbestos materials. 1 Remove and dispose of up to one square metre of asbestos-containing textured plaster, if impacted on exterior overhangs and soffits, throughout. 2 Remove and dispose of up to one square metre of asbestos-containing stucco materials applied to interior walls and entrance foyers. 3 Remove and dispose of up to one square metre of asbestos-containing plaster and/or drywall joint compound applied to walls and ceilings throughout the impact areas. 4 The scope of work is to include, but not be limited to, materials identified during the site walkthrough, scope of work document, architectural drawings and as directed by the Environmental Consultant. 5 Work will also include the removal and disposal of all settled dust and debris and other identified asbestos-containing or potentially contaminated materials. 6 The Contractor is responsible for all final quantity determinations. 7 Perform asbestos removal by the full enclosure Type 2 as outlined in this specification. 8 Seal surfaces with sealer in all areas from which asbestos has been removed, and surfaces potentially contaminated with asbestos. 9 All work will be subject to inspection and air monitoring inside and outside the asbestos work area(s) by the Environmental Consultant. Any contamination of the surrounding areas, indicated by visual inspection or air monitoring, shall necessitate complete cleanup of affected areas by the Asbestos Removal Contractor, at no cost to the Owner. The Asbestos Removal Contractor recognizes that time is of the essence in remedying any noted contamination or other deficiencies. 1 Supply and installation of external duct insulation on all new exhaust ductwork and where otherwise shown and/or indicated on the drawings. 2 Supply and installation of external duct insulation on all ducts connected to the exterior of the building. The insulation shall extend 3.0 m, (10 feet) from the exterior wall or until the first modulating damper, whichever is longer. 3 Supply and installation of external duct insulation on all supply air ductwork removed through abatement contractor. Refer to mechanical M1 drawings for duct removal scope of work, external insulation for ductwork in ceiling space within project scope of work contains asbestos. .4 Supply and installation of external duct insulation for removed U-5 AHU intake air ductwork. .5 Supply and installation of external duct insulation for 40"x40" relief duct and 60"x44" exhaust duct run up through chase to roof. A Performance Bond of a Company Registered to Conduct the Business of a Surety in Manitoba, in the Form Attached to the Tender Documents, in the Amount of Fifty Percent (50%); of the Contract Price; and A Labour and Materials Payment Bond of a Company Registered to Conduct the Business of Surety in Manitoba, in the Form Attached to the Tender Documents, in the Amount of Fifty Percent (50%) of the Contract Price. Question Acceptance Deadline: 2025/05/01 12:00:00 AM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Post-Bid
Educational
$400,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 9, 2025
May 30, 2025
1930 1st St, Brandon, MB
Related To This Project
Brandon, MB
Bid Date: May 08 2025
Brandon, MB
Bid Date: Apr 30 2025
Brandon, MB
Bid Date: Apr 29 2025
Brandon, MB
Bid Date: Apr 29 2025
Brandon, MB
Bid Date: May 02 2025
Brandon, MB
Bid Date: May 02 2025
Brandon, MB
Bid Date: May 01 2025
Brandon, MB
Bid Date: Apr 22 2025
Brandon, MB
Bid Date: May 13 2025
Brandon, MB
Bid Date: Apr 11 2025
Brandon, MB
Bid Date: Apr 11 2025
Brandon, MB
Bid Date: Apr 09 2025
Brandon, MB
--
Brandon, MB
Bid Date: Apr 18 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.