BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2025 at 8:00 PM

Updated April 26, 2025

Site work and paving for a road / highway in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Located at: ST216250104 Official Notice No. 9-1-2025 The High Impact asphalt paving project locations are as follows: North 19th Place West Glendale Avenue to West Hampton Avenue North 19th Street - West Hampton Avenue to West Eggert Place North 26th Street - West Galena Street to West Lisbon Avenue North 31st Street - West Lisbon Avenue to West North Avenue North Bartlett Avenue - East Kane Place to East North Avenue North Blaine Place - West Center Street to West Lisbon Avenue West Concordia Avenue - North 15th Street to North Teutonia Avenue West Congress Street - North Green Bay Avenue to West Roosevelt Drive West Courtland Avenue - North Green Bay Avenue to North Parkway Avenue East Lafayette Place - North Prospect Avenue to North Bartlett Avenue East Locust Street - North Humboldt Boulevard to North Holton Street West Locust Street - North 20th Street to North 29th Street North Newhall Street - East Belleview Place to East Park Place North Richards Street - East Capitol Drive to 1100' +/- n/o East Hope Avenue West Sheridan Avenue - North Teutonia Avenue to North 38th Street North Terrace Avenue - East Belleview Place to North Wahl Avenue West Vienna Avenue - North 1st Street to North Port Washington Avenue East Windsor Place - North Lake Drive to North Summit Avenue East Woodstock Place North Terrace Avenue to North Prospect Avenue Time for Completion: All work East Locust Street - North Humboldt Boulevard to North Holton Street shall be completed prior August 29, 2025. All other work on this contract shall be completed by November 14, 2025. Liquidated Damages, per diem: $1000.00/Day The residency requirement for this project is 40% of all hours worked on the project. One quarter of these hours must be attributable to residents living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53215, and 53233. The SBE requirement for this project is 15% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusions (OEI) website at https://milwaukee.diversitycompliance.com/. If there are any questions regarding SBE firms, please contact the OEI office at 414-286-5553. The apprenticeship requirements for this project are: N/A If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53215, and 53233 The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid. Bid Security Required: Bond, Certified Check, Cashiers Check or Cash to accompany bid: 10% of the Contractors Base Bid. For those bids being submitted through Bid Express and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov

Award

Roads / Highways

$1,202,900.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
288
Active Projects
151
Bidding Soon
1,944
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

May 15, 2025

Project location map

Multiple Locations, Milwaukee, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.