EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 5, 2025 at 8:00 PM

Updated October 1, 2024

Site work and asbestos abatement for an educational facility in Springfield, Illinois. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Generally, the workincludes removal and disposal of asbestos-containing floor tile, mastic, and exterior caulking, in accordance with allfederal and state rules and regulations in public and private schools. Bids shall include: 1. Properly completedProposal Form in duplicate. 2. Bid Bond in the amount of 10% of Bid. 3. Not less than the prevailing hourly wagerate as determined by the Illinois Department of Labor pursuant to Illinois Revised Statutes, Ch. 489, Sec. 39s-1et. seq. 4. Information for minority owned businesses which will perform at least a percentage of the work specifiedin the project and the proposal dollar value of the work. Specifications and Drawings will be available via email fromAllen Service Corporation, 217-793-1761, or from Central Illinois Plan Room at their websiteplans@ciplanroom.com. SANDBURG ELEMENTARY SCHOOL 2051 WABASH AVE SPRINGFIELD, ILLINOIS 62704 DUBOIS ELEMENTARY SCHOOL 120 S. LINCOLN AVE. SPRINGFIELD, ILLINOIS 62704 LAWRENCE SCHOOL 101 EAST LAUREL STREET SPRINGFIELD, ILLINOIS 62704 All Bidders are advised that all work of this Contract shall be subject to the provisions ofthe "Illinois Prevailing Wage Act". Prevailing wage rates have been determined and are on file at the Office of theState of Illinois Department of Labor, telephone (217) 782-6206. All Bidders shall submit and enclose with their bida notarized certification that the Contractor is not barred from bidding on the Contract as a result of a violation ofeither Section 33 E-3 or 33 E-4 of Article 33E, Public Act 85-1295 (Senate Bill 2002) effective January 1, 1989.Certification is located in the Proposal Form, Section 00300, of this Project Manual. Bids shall be accompanied by abid bond or cashier's check in the amount of 10% of Bid, made payable to the Springfield School District #186. Generally, the work includes removal and disposal of asbestos-containing floor tile, mastic, and exterior caulking, in accordance with all federal and state rules and regulations in public and private schools Failure of Bidders to submit bid bond or cashier's check in the amount of 10% of the bid shall be cause for rejectionof bid. Successful Bidder will be required to provide Surety Performance Bond and Payment Bond, each equal to100% of the Contract cost on prescribed forms within ten (10) days after notice of acceptance is issued by Owner.Surety on bond shall be by a duly authorized U. S. Treasury Backed company licensed to do business in the State ofIllinois, acceptable to Owner. Bidders are required to be signatory to the Project Labor Agreement (PLA) betweenthe Springfield School District #186 and the Central Illinois Building and Construction Trades Council. The Board of Education for Springfield School District #186 reserves the right to reject any or allbids and reserves the right to waive any irregularity in bidding, which in their considered opinion is warranted. Nobid shall be withdrawn for sixty (60) days after opening of bids without written consent of the Owner. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Educational

$80,000.00

Public - City

Asbestos Abatement, Site Work

6

7

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 08 - Openings

Division 08 - Openings

Windows, Louvers and Vents, Louvers
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Lighting
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
54
Bidding Soon
606
All Active Projects
306
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

April 28, 2025

img_map_placeholder

Multiple Locations, Springfield, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Asbestos Abatement Work

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.