Published April 11, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Clifton Park, New York. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Hubbs Road Multi-Use Path Contract DEC01-C01085GG-3350000 The Owner is the Town of Clifton Park, and the work site is located in the Town of Clifton Park, Saratoga County. This project includes construction of a multi-use path along the south side of Hubbs Road beginning at the intersection with Dutch Meadow Drive, continuing to the intersection with Hatlee Road / Main Street, where the multi-use path terminates. Sidewalk construction begins on the west side of Main Street from the Hubbs Road / Hatlee Road intersection and continues to the intersection with Mac Elroy Road and Longkill Road. This project has been funded in part by the Climate Smart Communities Grant Program, Title 15 of the Environmental Protection Fund through the New York State Department of Environmental Conservation. There is an overall goal of 30% for Minority and Women-Owned Business Enterprises (MWBE) participation, (based on the current availability of qualified MBEs and WBEs). For the purposes of providing meaningful participation by MWBEs on the contract and achieving the contract goals, contractors should reference the directory of New York State Certified MWBEs found at online. Additionally, the contractor is encouraged to contact the Division of Minority and Woman Business Development ((518) 292-5250; (212) 803-2414; or (716) 846-8200) to discuss additional methods of maximizing participation by MWBEs on the contract. Where MWBE goals have been established herein, pursuant to 5 NYCRR 142.8, contractor must document "good faith efforts" to provide meaningful participation by MWBEs as subcontractors or suppliers in the performance of the contract. In accordance with Section 316-a of Article 15-A and 5 NYCRR 142.13, the contractor acknowledges that if the contract is found to have willfully and intentionally failed to comply with the MWBE participations goals set forth in the contract, such a finding constitutes a breach of contract and the contractor shall be liable to the department for liquidated or appropriate damages, as set forth herein. This is a public works project and prevailing wages as determined by the New York State Department of Labor must be paid. Contractors that obtain the Contract Documents from a source other than the issuing office must notify the issuing office in order to be placed on the official Registered Plan Holders list to receive Addenda and any other Bid correspondence. Bids received from Contractors other than those on the official Registered Plan Holders list will not be accepted. Question Deadline 04/24/2025 Questions regarding the Contract Documents should be directed to the Town of Clifton Parks Planning Director, John Scavo, either through email at: jscavo@cliftonpark.org or by telephone at (518) 371-6054. Bidders shall promptly notify John Scavo of any errors, omissions, conflicts, or ambiguity within the Contract Documents within three (3) business days of bid opening date. No questions or inquiries regarding this bid will be accepted within three (3) business days prior to the bid opening date Addenda will be emailed from MJ to Bidders listed on the official Registered Plan Holders list. An emailed response from the Bidder to the Addendum, sent by MJ, will act as proof that the Bidder received the Addendum. In addition to an emailed response, Bidders must acknowledge receipt of all Addenda by signing and dating each Addendum on the Bid Form and the Acknowledgement of Receipt of Addenda. Failure of any Bidder to receive any such Addendum or interpretation shall not relieve such Bidder from any obligation under this Bid submittal. All Addenda so issued shall become part of the Contract Documents. All bids must include the completed Bid Form, Non-Collusive Bidding and Disbarment Certifications, and Lobbying Certifications. This is a unit price bid as described in the Instructions to Bidders. No bidder may withdraw his/her bid within forty-five (45) calendar days after the actual date of the opening thereof. Each bid must be accompanied by security bond or certified check, in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Instructions to Bidders. The Bidder to whom the Contract is awarded will be required to furnish Performance, Payment and Guarantee Bonds from an acceptable Surety Company, for an amount not less than 100% of the accepted bid. The successful Bidder, and all subcontractors, must have an approved CCA-2 on file with NYSDOT prior to being awarded a contract. If the successful Bidder does not currently have a CCA-2 on file with NYSDOT, the Bidder may find the CCA-2 forms and instruction for completion online The Town of Clifton Park reserves the right to consider the bids for forty-five (45) days after receipt before awarding any Contract, and to waive any minor informalities in, and to reject, any and all bids.

Post-Bid

Roads / Highways

$5,000,000.00

Public - City

Paving, Site Work

44

5

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Lath, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
91
Bidding Soon
1,360
All Active Projects
654
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

June 30, 2025

img_map_placeholder

Multiple Locations, Clifton Park, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Hubbs Road Multi-Use Path

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.