Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 16, 2025 at 8:00 PM
Updated May 17, 2025
Site work for a water / sewer project in Elk Horn, Iowa. Completed plans call for site work for a water / sewer project.
Project consists of replacing approximately 1,320 LF of 6" water mains along with associated valves, service connections, fire hydrants, and other miscellaneous and associated work. The Project has an expected duration of 165 calendar days (November 21, 2025) for substantial completion and 193 calendar days (December 19, 2025) for final completion. Work on the Project shall commence on or after the date specified in the written Notice to Proceed. The Project is located on Main Street (Hwy 173) from Broadway Street to south of Hill Street, the alley from Broadway Street to Elm Street, and College Street from Union Street to Main Street (Hwy 173) and includes the following Work: Replacing approximately 1,320 LF of 6" water mains along with associated valves, service connections, fire hydrants, and other miscellaneous and associated work A Bid must be accompanied by Bid security as required by Iowa Code section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the Owner, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be made payable to Owner in an amount of five (5) percent of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and shall be in the form of a cashier's check or certified check drawn on a state-chartered or federally chartered bank, or a certified share draft drawn on a state-chartered or federally chartered credit union, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 of the General Conditions. Owner anticipates that the Project's total bid price will be approximately $198,160.00. The Project has an expected duration of 165 calendar days (November 21, 2025) for substantial completion and 193 calendar days (December 19, 2025) for final completion. Work on the Project shall commence on or after the date specified in the written Notice to Proceed. A pre-bid conference will not be conducted for this project. The Owner reserves the right to reject any or all bids, to waive informalities and irregularities in the form of the bid, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the Owner.
Award
Water / Sewer
$198,160.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
14
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 29, 2025
May 29, 2025
Multiple Locations, Elk Horn, IA
Related To This Project
Elk Horn, IA
Bid Date: Apr 29 2025
Elk Horn, IA
Bid Date: May 06 2025
Elk Horn, IA
Bid Date: May 12 2025
Elk Horn, IA
Bid Date: Jul 29 2025
Elk Horn, IA
Bid Date: Dec 16 2025
Elk Horn, IA
Bid Date: Feb 20 2024
Elk Horn, IA
Bid Date: Jan 29 2021
Elk Horn, IA
Bid Date: Sep 28 2023
Elk Horn, IA
Bid Date: Sep 05 2023
Elk Horn, IA
Bid Date: Jun 06 2023
Elk Horn, IA
Bid Date: Jul 28 2022
Portsmouth, IA
Bid Date: Apr 29 2025
Ankeny, IA
Bid Date: Apr 29 2025
Davenport, IA
Bid Date: Apr 28 2025
Pisgah, IA
Bid Date: Apr 17 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
