EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Iowa City, Iowa. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Project will involve the following: removal of existing pavement and replacement with PCC pavement, erosion control, site grading, site restoration and other related work. Bids security in the amount of five percent of the bid must accompany bid in accordance with the Information for Bidders. The following limitations shall apply to this Project: Approximate Start Date: June 2, 2025 Final Completion Date: August 15, 2025 Working Days: 40 days Liquidated Damages: $500 per working day for work extending beyond the specified number of working days and $500 per calendar day for work extending beyond the final completion date Performance Bond and Labor and Material Payment bond will be required in the full amount of the contract. The Owner reserves the right to reject any or all proposals and also reserves the right to waive technicalities and irregularities. The project includes all labor, materials and equipment necessary for the replacement of failed pavement and storm sewer at the Center for Innovation (CFI) in Iowa City, Iowa. Work includes sawcut and removal of existing failed paving, installation of subdrain, subgrade preparation, installation of concrete paving, installation of concrete sidewalk, erosion control, finish grading, site restoration and other related work. at the Center for Innovation (CFI), 2255 N. Dubuque Rd, Iowa City, IA 52245 Contractors are encouraged to visit the site. Direct questions to: Scott Pottorff, P.E. MMS Consultants, Inc. (319) 351- 8282 s.pottorff@mmsconsultants.net

Bid Results

Sidewalks / Parking Lot

$271,900.00

Public - City

Paving, Site Work

9

11

6

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
34
Bidding Soon
633
All Active Projects
243
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

June 2, 2025

img_map_placeholder

2255 N Dubuque Rd, Iowa City, IA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

ICCSD CFI Parking Improvements - Phase Three Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.