BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 18, 2025 at 8:00 PM

Updated June 19, 2025

Site work and paving for a mixed-use development in Iowa City, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project includes resurfacing HMA streets with 3" HMA pavement, Full Depth HMA and PCC Patching, Sanitary Sewer Manhole Replacement, Storm Intake Top Replacement, PCC Sidewalk and ADA Curb Ramp Improvements at the following locations: South Dubuque Street, East College Street, Glendale Road, Ridgeway Drive, North Lowell Street, Hawthorne Street, Ashwood Drive, South Lowell. Each proposal shall be completed on a form furnished by the City and must be submitted in a sealed envelope. In addition, a separate sealed envelope shall be submitted containing a completed Bidder Status Form and a bid security executed by a corporation authorized to contract as a surety in the State of Iowa, in the sum of 10% of the bid. The successful bidder will be required to furnish a Performance, Payment, and Maintenance Bond in an amount equal to one hundred percent (100%) of the contract price and in the form shown in Section 0510, said bond to be issued by a responsible surety approved by the City, and shall guarantee the prompt payment of all materials and labor, and also protect and save harmless the City from all claims and damages of any kind caused directly or indirectly by the operation of the contract, and shall also guarantee the maintenance of the improvement for a period of five (5) year(s) from and after its completion and formal acceptance by the City Council. Start Date: June 9, 2025 o Phase 1 - East College Street, South Dubuque Street, and South Lowell Street: Work shall start with and priority to complete and reopen East College Street, South Dubuque Street and South Lowell Street to traffic prior to completion of locations near Glendale Road. Substantial Completion: August 8, 2025. Includes all work to reopen all streets to traffic, excludes sod installation. o Phase 2 - Glendale Road, Ridgeway Drive, North College Street, and Hawthorne Street Substantial Completion: November 1, 2025. Includes all work to reopen all streets to traffic. Final Completion (final sod installation): November 15, 2025 Liquated Damages: $250 per day Prospective bidders are advised that the City of Iowa City desires to employ minority contractors and subcontractors on City projects. A listing of minority contractors can be obtained from the Iowa Department of Inspections and Appeals at (515) 281-5796 and the Iowa Department of Transportation Contracts Office at (515) 239-1422. The City reserves the right to reject any or all proposals, and also reserves the right to waive technicalities and irregularities.

Award

Roads / Highways

$2,483,513.00

Public - City

Paving, Site Work

29

6

2

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
87
Bidding Soon
1,085
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2025

June 9, 2025

Project location map

Multiple Locations, Iowa City, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.