BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 24, 2025 at 8:00 PM

Updated April 25, 2025

Site work and paving for a mixed-use development in Sheboygan, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The majority work of this contract is generally described as follows: 2,114 SY of Concrete Pavement Removal, 1,572 CY of Excavation Common, 1,078 Tons of Base Aggregate, 1,199 LF of Curb and Gutter, 2,000 SY of Concrete Pavement 2,938 SF of Concrete Sidewalk, _ 2 Precast Inlets, 1 Precast Manhole, _ _ 8 Concrete Bases _ 23 Traffic and Pedestrian Signal Faces, 1,180 LF of Conduit, 2.890 LF of Electrical Wire. To access the bid form, download the project documents and select the online bidding button on the online advertisement. As soon as practical, after said closing time, all bids will be opened and a summary of the bids will be available online. Pre-Bid Qualification: All bidders shall be required to file or have on file a valid Bidder's Proof of Responsibility form with the Engineering Division, City of Sheboygan, not less than five (5) days prior to the time of opening of these bids. Only bidders who have demonstrated their qualifications to perform the work will be permitted to bid. Forms are included in the proposed contract documents. Subcontractors: The apparent Successful Bidder, and any other Bidder so requested, shall within ten (10) days after Bid opening, submit to the City a Bidder's Proof of Responsibility Affidavit and Non-Collusion Affidavit from each Subcontractor. Forms are included in the proposed contract documents. This contract letting shall be subject to the provisions of Section 62.15, 66.0901, and 779.15 of the Wisconsin Statutes. Question Deadline 04/21/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than three days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Bid Results

Roads / Highways

$725,807.00

Public - City

Paving, Site Work

96

11

8

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
81
Bidding Soon
937
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2025

May 23, 2025

Project location map

Taylor Drive and Wilgus Avenue, Sheboygan, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.