BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 2, 2025

Site work and paving for a sidewalk / parking lot in Barneveld, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Barneveld Brigham Fire-Rescue District (District) is accepting sealed bids for a single contract for parking lot asphalt pavement and reconstruction for various areas of the Barneveld-Brigham Municipal Building parking lot, 403/407 E County Road ID, Barneveld, Wisconsin SCOPE OF WORK TO BE PERFORMED 1. Bid proposals shall be based on lump sum bid information but shall include standard prices as indicated in this document. Standard quantities shall be used as the basis for total contract if additions or reductions are made to this project. 2. The Barneveld-Brigham Fire-Rescue District Board reserves the right to accept or reject any or all bids or remove portions of this project for budgeting or other purposes that are in the financial or other best interest of the District. 3. Conditions and Completion of Work: Work shall occur only when the air temperature approximately 3 feet above grade, in shade, and away from artificial heat sources, is greater than 36 F for upper layers or 32 F for lower layers. All designated repairs must be completed between April 15 and November 1, 2025. Surface Preparation and Application: Before placing asphaltic base or surface courses, correct the existing pavement by filling potholes, sags, and depressions or altering the existing crown. The asphaltic mixture shall only be placed on a prepared, firm, and compacted base, foundation layer, or existing pavement substantially surface-dry and free of loose and foreign material. 4. Equipment and Employees: Contractor to furnish all machinery, labor, and other necessary incidentals to properly perform the scope of work. 5. Traffic Control: Contractor shall be responsible for all temporary traffic control. All work will be done under traffic unless otherwise directed by the District. The District reserves the right to require higher or lower limits where warranted. In the event that the contractor fails to maintain and keep in force the insurance herein required, the District shall have the right to cancel and terminate the contract without notice

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
1
Bidding Soon
925
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2025

May 28, 2025

Project location map

403 Co Rd ID, Barneveld, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.