Site work for a power facility in Sept-Iles, Quebec. Conceptual plans call for site work for a power facility.
Increasing the capacity of the Sainte-Marguerite-3 (SM-3) generating station by at least 440 MW (or even 600 MW according to some estimates), reaching a total capacity of over 1,300 MW by 2031. The scope of work includes the installation of a third turbine-generator unit in the existing underground infrastructure, without diverting the river or modifying the reservoir. Key details of the SM-3 project: - Objective: To increase flexibility and power output during peak winter periods to meet the requirements of the 2035 Action Plan. - Work: Installation of a third turbine, a 300-metre underground penstock, and a new transformer. TIMELINE: The project is preliminary. Preliminary studies are underway at the owner. According to the owner's preliminary scheduling development of the project is scheduled from 2028 to 2031. Notes: - The project to upgrade the equipment at the Sainte-Marguerite-3 power plant is subject to an environmental assessment. - Project value is not finalized and is estimated based on the average rate $/MW for such projects in Quebec.
Conceptual
Power Plant
$2,500,000,000.00
Public - State/Provincial
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 15, 2028
Multiple Locations, Sept-Iles, QC
Related To This Project
Sept-Iles, QC
Bid Date: Apr 02 2026
Sept-Iles, QC
Bid Date: Mar 27 2026
Sept-Iles, QC
Bid Date: Mar 16 2026
Sept-Iles, QC
Bid Date: Mar 17 2026
Sept-Iles, QC
Bid Date: Mar 20 2026
Sept-Iles, QC
Bid Date: Feb 06 2026
Sept-Iles, QC
Bid Date: Feb 06 2026
Discharge and Disposal of Municipal Biosolids From the Downtown Wastewater Treatment Plant - 6015095
Sept-Iles, QC
Bid Date: Feb 20 2026
Sept-Iles, QC
Bid Date: Mar 03 2026
Sept-Îles, QC
Bid Date: Dec 19 2025
Sept-Iles, QC
Bid Date: Jan 20 2026
Sept-Iles, QC
Bid Date: Jan 08 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.