Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 11, 2026 at 8:00 PM
Updated March 12, 2026
Site work and paving for a civil project in Yorktown, Indiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Park One Boulevard New Road Construction and Intersection Improvements at S.R. 332 & W Jackson Street in Delaware County Submit all questions in writing via email to AMERICAN STRUCTUREPOINT at jstetzel@structurepoint.com prior to 4:00 p.m. local time, January 30, 2026. SCOPE OF WORK This work includes new road construction (Park One Boulevard) and intersection improvements at S.R. 332 and W Jackson Street in Delaware County, Indiana. The scope of this project includes, but is not limited to, the following work as shown on the Construction Plans: Park One Boulevard: New road construction between Brevini Drive to S.R. 332. Park One Boulevard will consist of two left turn lanes and one thru-right turn lane in the northbound direction. One right turn lane and one thru-left turn lane will be present in the southbound direction. Park One Boulevard will be constructed of HMA pavement on a subgrade and will include a culvert replacement, storm sewer trunklines, new roadway ditches, ditch regrading, roadway signing, pavement marking modifications, sanitary sewer and water main relocations. The above noted work will be done without restricting traffic along S.R. 332 during construction. Shoulder closures along S.R 332 will be allowed in accordance with the maintenance of traffic plan. S.R. 332 and W Jackson Street: Reconstruction of S.R. 332 median to remove existing barrier wall and inlet structures and add a left turn lane, centercurb, new inlet structures and outlet pipes for access to Park One Boulevard. Installation of traffic signal strain poles and foundations, signal heads, controller cabinet, detector loops, as well as pavement marking modification and sheet signs. New median centercurbs will be added along S.R. 332 to restrict left turning movements at the intersection with Executive Park Dr. and at the driveway on the north side of S.R. 332 approximately 525 east of Executive Park Dr
Award
Roads / Highways
$2,747,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2026
April 13, 2026
IN-332 & W Jackson St, Yorktown, IN
Related To This Project
Yorktown, IN
Bid Date: Jun 09 2025
Yorktown, IN
--
Yorktown, IN
--
Yorktown, IN
Bid Date: Nov 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
