BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 11, 2025 at 8:00 PM

Updated July 12, 2025

Site work and paving for a mixed-use development in Seattle, Washington. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The project consists of the renovation and expansion of the existing Tiger Summit Trailhead, located in WA State Department of Natural Resources (DNR) managed Tiger Mountain State Forest. Work includes clearing and grading a forested site and construction of parking areas, driveways, storm water management facilities, pedestrian routes, gathering areas, trail access and coordinating with installation of owner provided and installed pre-manufactured concrete vault restroom structure. The estimated cost of the project is $2,021,000, and the required substantial completion date is October 31, 2025. The project is located at the Tiger Summit Trailhead, 1000 Rd accessed from SR18, Tiger Summit Exit. Latitude 47.467586, Longitude -121.936650. Site Directions: The project is located at the Tiger Summit Trailhead, 1000 Rd accessed from SR18, Tiger Summit Exit. Latitude 47.467586, Longitude -121.936650. Prebid Location: Tiger Summit Trailhead, 1000 Rd accessed from SR18, Tiger Summit Exit. Latitude 47.467586, Longitude 121.936650. Prebid Directions: From SR-18, take the Tiger Summit Exit, located on the north side of the highway where there is a large gravel parking area. There are two forest road gates ahead, drive through the left gate. Tiger Summit Trailhead is located approximately 1/4 mile up the 1000 Rd. LAST DAY FOR QUESTIONS IS WED, APR 30, 5PM. The voluntary Diverse Business goal of 26%, which is an aggregate of: 10% Minority Business Enterprises (MBE), 6% Women Business Enterprises (WBE), 5% Veteran-owned Business, and 5% Washington Small Businesses self- identified in the Washington Electronic Business Solution (WEBS). Any prospective bidder desiring an explanation or interpretation of the solicitation, Drawings, Technical Specifications, or other Contract Documents must make a request to Owner at or before the prebid conference. Questions regarding interpretation of the requirements of the Contract Documents shall be submitted to the Owner and will be referred to the A/E.

Under Construction

Sidewalks / Parking Lot

$1,852,852.00

Public - State/Provincial

Paving, Site Work

141

41

15

7

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
124
Bidding Soon
1,376
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2025

May 30, 2025

Project location map

1000 Rd, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.