Site work and paving for a road / highway in Newton, Kansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of May 30, 2025, the project was awarded to Kansas Paving - Park City, with an awarded amount of $249,024.35 For the construction of: Annual Overlay Program 2,212 Tons of Asphaltic Concrete, and 15,553 SY of Asphalt Milling ADD ALTERNATES 1,242 Tons of Asphaltic Concrete, and 7,669 SY of Asphalt Milling. Project Days: Base bid work must be completed by August 1, 2025. The work shall be performed between 8:00 a.m. and 5:00 p.m. Monday through Friday unless otherwise approved by the Engineer. Construction Shall not begin prior to May 27th, 2025. No work will be allowed on City of Newton observed holidays or weekends. Contracts must be returned within 10 days after Notice of Award. A notice to proceed will be issued shortly thereafter. The Owner reserves the right to waive any informalities or to reject any or all bids BASE BID WORK 1. South Kansas Ave. Washington Rd - SE 10th St. 2,471 SY Millings 639 tons Asphalt Edge Mill 1.5" in depth at the curb to 0.25" in depth 6' out from the curb. Mill a butt joint at Washington Rd intersection and SE 10th St intersection on South Kansas Ave. sufficient to provide a smooth transition from new finished surface to existing pavement. Overlay with 2.5" of BM-1 asphaltic concrete. The Contractor will be required to maintain access to all businesses during construction. The City of Newton Street Division will repair any soft spots in the base after the milling process is complete. The Contractor shall prepare for a delay in the overlay process while the City completes the repairs. SE 6th St. - SE 5th St. 1,230 SY Millings 167 tons Asphalt Mill entire surface of the street curb to curb 1.5" in depth. Overlay with 2.5" of BM-1 asphaltic concrete. 3 The Contractor will be required to maintain access to all businesses during construction. The City of Newton Street Division will repair any soft spots in the base after the milling process is complete. The Contractor shall prepare for a delay in the overlay process while the City completes the repairs. SE 4th St. - Myrtle St 588 SY Millings 80 tons Asphalt Mill entire surface of the street curb to curb 1.5" in depth. Overlay with 2.5" of BM-1 asphaltic concrete. The Contractor will be required to maintain access to all businesses during construction. The City of Newton Street Division will repair any soft spots in the base after the milling process is complete. The Contractor shall prepare for a delay in the overlay process while the City completes the repairs. 2. South Pine St. a. Due to a scheduled city event, work on South Pine St from 1st ST. - Cedar Dr must be completed with ADA compliant surfaces prior to July 3rd or construction may begin on South Pine St after July 7th with no conflicts. A milled roadway surface will not be allowed in this area between July 3rd - July 6th. 1st St - SE 2nd St 1,329 SY Millings 145 tons Asphalt Mill entire surface of the street curb to curb 1.5" in depth. Overlay with 2" of BM 1 asphaltic concrete. The Contractor will be required to maintain access to all businesses during construction. Due to a scheduled event, no work can be performed during July 3-6. The City of Newton Street Division will repair any soft spots in the base after the milling process is complete. The Contractor shall prepare for a delay in the overlay process while the City completes the repairs. SE 2nd St - SE 3rd St 1,362 SY Millings 148 tons Asphalt Mill entire surface of the street curb to curb 1.5" in depth. Overlay with 2" of BM 1 asphaltic concrete. The Contractor will be required to maintain access to all businesses during construction. Due to a scheduled event, no work can be performed during July 3-6. The City of Newton Street Division will repair any soft spots in the base after the milling process is complete. The Contractor shall prepare for a delay in the overlay process while the City completes the repairs. SE 4th St - SE 5th St 1,003 SY Millings 109 tons Asphalt Mill entire surface of the street curb to curb 1.5" in depth. Overlay with 2" of BM 1 asphaltic concrete. The Contractor will be required to maintain access to all businesses during construction. Due to a scheduled event, no work can be performed during July 3-6. 4 The City of Newton Street Division will repair any soft spots in the base after the milling process is complete. The Contractor shall prepare for a delay in the overlay process while the City completes the repairs. SE 5th St. - SE 5th St 196 SY Millings 21 tons Asphalt Mill entire surface of the street curb to curb 1.5" in depth. Overlay with 2" of BM 1 asphaltic concrete. The Contractor will be required to maintain access to all businesses during construction. Due to a scheduled event, no work can be performed during July 3-6. The City of Newton Street Division will repair any soft spots in the base after the milling process is complete. The Contractor shall prepare for a delay in the overlay process while the City completes the repairs. SE 6th St - Mead St 1,224 SY Millings 133 tons Asphalt Mill entire surface of the street curb to curb 1.5" in depth. Overlay with 2" of BM 1 asphaltic concrete. The Contractor will be required to maintain access to all businesses during construction. Due to a scheduled event, no work can be performed during July 3-6. The City of Newton Street Division will repair any soft spots in the base after the milling process is complete. The Contractor shall prepare for a delay in the overlay process while the City completes the repairs. Indian Ln - Cedar Dr 1,354 SY Millings 147 tons Asphalt Mill entire surface of the street curb to curb 1.5" in depth. Overlay with 2" of BM 1 asphaltic concrete. The Contractor will be required to maintain access to all businesses during construction. Due to a scheduled event, no work can be performed during July 3-6. The City of Newton Street Division will repair any soft spots in the base after the milling process is complete. The Contractor shall prepare for a delay in the overlay process while the City completes the repairs. SE 13th St - SE 14th St 1,109 SY Millings 120 tons Asphalt Mill entire surface of the street curb to curb 1.5" in depth. Overlay with 2" of BM 1 asphaltic concrete. The Contractor will be required to maintain access to all businesses during construction. Due to a scheduled event, no work can be performed during July 3-6. The City of Newton Street Division will repair any soft spots in the base after the milling process is complete. The Contractor shall prepare for a delay in the overlay process while the City completes the repairs. 3. SE 6th St S. Payton Ave - S. Spencer Rd. 3,686 SY Millings 501 tons Asphalt Mill entire surface of the street curb to curb 1.5" in depth. Overlay with 2" of BM 1 asphaltic concrete. 5 The City of Newton Street Division will repair any soft spots in the base after the milling process is complete. The Contractor shall prepare for a delay in the overlay process while the City completes the repairs. ADD ALTERNATE WORK 1 This work will only be awarded if prices are reasonable and there is sufficient funding available in addition to base bid work. The City may consider individual blocks from this list. 4. South Payton Ave SE 6th St. - SE 3rd St. 1,326 SY Millings 381 tons Asphalt Edge Mill 1.5" in depth at the curb to 0.25" in depth 6' out from the curb. Mill a butt joint at mid-block valley gutter sufficient to provide a smooth transition from new finished surface to existing pavement. Overlay with 2.5" of BM-1 asphaltic concrete. The Contractor will be required to maintain access to all businesses during construction. The City of Newton Street Division will repair any soft spots in the base after the milling process is complete. The Contractor shall prepare for a delay in the overlay process while the City completes the repairs. ADD ALTERNATE WORK 2 This work will only be awarded if prices are reasonable and there is sufficient funding available in addition to base bid work. The City may consider individual blocks from this list. 5. Southeast 3rd St. S. Payton Ave - S. Spencer Rd. 1,638 SY Millings 480 tons Asphalt Edge Mill 1.5" in depth at the curb to 0.25" in depth 6' out from the curb. Mill a butt joint at Spencer Rd sufficient to provide a smooth transition from new finished surface to existing pavement. Overlay with 2.5" of BM-1 asphaltic concrete. The Contractor will be required to maintain access to all businesses during construction. The City of Newton Street Division will repair any soft spots in the base after the milling process is complete. The Contractor shall prepare for a delay in the overlay process while the City completes the repairs. ADD ALTERNATE WORK 2 This work will only be awarded if prices are reasonable and there is sufficient funding available in addition to base bid work. The City may consider individual blocks from this list. 6 6. Southeast 14th St 3,504 SY Millings 381 tons Asphalt Parkwood Ln.- S. Kansas Ave Mill entire surface of the street, curb to curb, 1.5" in depth. Overlay with 2" of BM-1 asphaltic concrete. The Contractor will be required to maintain access to all businesses during construction. The City of Newton Street Division will repair any soft spots in the base after the milling process is complete. The Contractor shall prepare for a delay in the overlay process while the City completes the repairs. CONSTRUCTION SPECIFICATIONS Project #S-2-25 Communications concerning this Bid shall be addressed to: Chris Ciardella, P.E. City of Newton 316-284-6020
Award
Roads / Highways
$249,024.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2025
May 27, 2025
Multiple Locations, Newton, KS
Related To This Project
Newton, KS
Bid Date: Jul 23 2025
Newton, KS
Bid Date: Oct 10 2025
Newton, KS
Bid Date: Aug 21 2025
Newton, KS
Bid Date: Sep 25 2025
Newton, KS
--
Newton, KS
--
Newton, KS
Bid Date: Jul 11 2025
Newton, KS
Bid Date: Apr 03 2025
Newton, KS
Bid Date: Feb 06 2025
Newton, KS
Bid Date: Feb 04 2025
Newton, KS
Bid Date: Dec 09 2024
Newton, KS
Bid Date: Dec 18 2024
Newton, KS
Bid Date: Dec 09 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.