BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Site work and paving for a mixed-use development in Crystal Lake, Illinois. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project consists of the complete reconstruction of the Depot Park and associated park elements. In general, the project includes parking lot resurfacing/reconstruction, ADA improvements, installation of a decorative fountain, stage and seating elements, electrical improvements, concrete and brick paver installation, drainage improvements, and other associated improvements as part of the park improvements as shown on the project plans and as described in the special provisions. QA -- 05/01/2025

Award

Playgrounds / Parks / Athletic Fields

$6,677,095.00

Public - City

Paving, Site Work

76

27

8

6

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
538
Active Projects
307
Bidding Soon
3,861
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2025

June 15, 2025

Project location map

70 E Woodstock St, Crystal Lake, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.