BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2025 at 8:00 PM

Updated May 9, 2025

Site work for a water / sewer project in Renton, Washington. Completed plans call for site work for a water / sewer project.

The work involved under the terms of this contract document shall be full and complete installation of the facilities, as shown on the plans and as described in the construction specifications, to include but not be limited to: oFurnish and install approximately 1,400 - linear feet of 8-inch sewer main. oFurnish and install 27-side sewer stubs o Furnish and install new side sewers on private properties by either open trench or trenchless methodologies, including all necessary restoration work. oFurnish and install 33 new ductile iron tees onto existing concrete main on private property. o Furnish and install 8 48-in diameter man holes, depths varying. oTrench excavation, including removal of existing unsuitable material, removal and abandonment of existing utilities, disposal of excavated material, shoring, and dewatering. "Removal and replacement of asphalt concrete pavement, asphalt overlay, concrete curbs, gutters, sidewalks and driveways. o ROW Surface and other restoration o Furnish and install approximately 65 LF ductile iron Class 52 8-inch diameter restrained joint water pipe and restrained joint fittings with polywrap. oFurnish and install a 12-inch x 8-inch tapping tee and valve assembly Installing and maintaining adequate TESC measures and restoring all disturbed areas.Temporary traffic control measures following the contract documents and applicable City of Renton and MUTCD standards. o CCTV inspection of sewer mains. Pre and post Installation Inspection o Bypass pumping. The estimated project cost is $2,700,000-$3,100,000. *This project has been identified as part of a stimulus package A total of 1.50 working days is allowed for completion of the project. For Bid Item Descriptions see Special Provisions Section 1-09.14. Any contractor connected with this project shall comply with all Federal, State, County, and city codes and regulations applicable to such work and perform the work in accordance with the plans and specifications ofthis contract document. The City reserves the right to reject any and/or all bids and to waive any and/or all informalities. A certified check or bid bond in the amount of five percent (5%) of the total of each bid must accompany each bid. Women and Minority Business Enterprises (WMBE) are encouraged to bid. The city's Fair Practices, NonDiscrimination, and Americans with Disability Act Policies shall apply. Questions about the project shall be addressed to Jesse Newman, Public Works Department, at 1-425- 757-7778 or jnewman@rentonwa.gov. PN_AS210428-10 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$3,100,000.00

Public - City

Site Work

99

14

4

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
232
Active Projects
114
Bidding Soon
1,343
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

July 1, 2025

Project location map

Multiple Locations, Renton, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.