Published July 6, 2025 at 8:00 PM

Updated July 7, 2025

Site work and paving for a mixed-use development in Renton, Washington. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

**As of July 03, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Project No. CAG-25-098 Rehabilitation of Taxiway A, which includes asphalt pavement removal, maintaining the existing subgrade and subbase, constructing a new base course and bituminous stabilized base course, and HMA. surface course; Rehabilitation of the sea plane ramp, which will include asphalt pavement removal, constructing a new base course, cement-treat Mill and inlay of the connector taxiways and existing service road west of Taxiway A; Replacement of taxiway edge lights and airfield signs with new LED fixtures: Miscellaneous electrical improvements as described in the contract documents; Taxiway pavement marking; and Infield storm improvements. drainage. The Engineer's estimate for construction of the base bid schedules (Schedule A+B+G+ H) is $16-$18 million. A total of 135 calendar days is allowed for completion of Phase 1 and a total of 79 calendar days is allowed for completion of Phase 2. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. C24003681 The Engineer's estimate for construction of the base bid schedules (Schedule A + B + G + H) is $16-$18 million onducted after the meeting, Contractor's License Law of the Technical questions about State of Washington." the project, shall be addressed A certified check or bid bond in to: Greg Reince, Century West the amount of five percent (5%) of Engineering, at. greince@ceiitu- the total of each bid must accomrywest.com and William Adams, pany each bid. City of Renton, at. wadams@rent- The City's Fa ir Practices, Nononwa.gov Bid Result - Schedule A - Pivetta Brothers Construction, Inc - $8,325,169.80 Schedule B - Pivetta Brothers Construction, Inc - $846,164.50 Schedule C - Pivetta Brothers Construction, Inc - $469,428.00 Schedule D - Pivetta Brothers Construction, Inc - $476,045.16 Schedule E - Pivetta Brothers Construction, Inc - $296,230.00 Schedule F - Pivetta Brothers Construction, Inc - $416,297.84 Schedule G - Pivetta Brothers Construction, Inc - $5,034,608.86 Schedule H - Scarsella Contractors - $327,333.45 Schedule I - Pivetta Brothers Construction, Inc - $261,628.29 Schedule J - Pivetta Brothers Construction, Inc - $429,504.34 Schedule K - Scarsella Contractors - $271,704.20

Bid Results

Transportation Terminals

$17,154,115.00

Public - City

Paving, Site Work

185

14

2

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
0
Bidding Soon
1,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

August 1, 2025

Project location map

243 W Perimeter Rd, Renton, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.