BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2025 at 8:00 PM

Updated May 14, 2025

Renovation of a fitness / recreation center in Elk Grove Village, Illinois. Completed plans call for the renovation of a fitness / recreation center.

As of May 2, 2025, this project has not yet been awarded. The project is expected to be awarded on May 8, 2025. 1. Bids must be submitted in sealed envelopes, and plainly marked "Sealed bid - 2025 al hattendorf center cabinet replacement " and have the bidder's company name indicated on the face of the envelope. 2. Bids shall be submitted only on the bid form provided. The bid form must be completed in full and all total prices must include all work as stated in the specifications. 3. All bids submitted will be considered firm for a period of 60 days from the bid opening date. 4. All bidders are required to demonstrate to the satisfaction of the park district, that they are capable and able to complete the work as required in the specifications. Each bidder shall submit with his bid, proof that he satisfactorily performed work of a similar nature to that specified within the preceding two years, together with the locations and the names of the responsible individuals in charge of such projects. The general prevailing rate of wages in the locality for each craft or type of worker or mechanic needed to execute the contract or perform the work, and the general prevailing rate for legal holiday and overtime work, as ascertained by the park district or the illinois department of labor shall be paid for each craft or type of worker needed to execute the contract or to perform such work and it shall be mandatory upon the contractor to whom the contract is awarded and upon any subcontractor under him to pay not less than the specified rates to all laborers, workers and mechanics employed by them in the execution of the contract or such work. Certified payroll is required on this project for both general and subcontractors. The Contractor shall commence the work with authorization from the Owner pending delivery, and perform all work on a regular full-time basis during weekdays until final completion by August 29, 2025. SCOPE OF WORK: The CONTRACTOR shall provide all of the materials and perform all of the work described in the specifications entitled: 2025 Al Hattendorf Center Cabinet Replacement and in strict accordance with the requirements of all of the component parts of this Agreement as noted under Article V, all of which are attached hereto and made a part hereof

Award

Fitness / Rec Centers

$62,279.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
510
Active Projects
276
Bidding Soon
3,726
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

May 30, 2025

Project location map

225 E Elk Grove Blvd, Elk Grove Village, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.