BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 26, 2025 at 8:00 PM

Updated May 3, 2025

Demolition, site work, paving, outdoor lighting and addition to a mixed-use development in Joint Base Lewis McChord, Washington. Completed plans call for the addition of a 5,964-square-foot military facility; for the demolition of a military facility; for site work for a military facility; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

This procurement is being funded with Fiscal Year 2024 (FY24) Military Construction (MILCON) funds. The project consists of construction of a 5,964 square feet (SF) addition to an existing aircraft paint shop and installation of a media blast booth. Construction will include fire protection system, intrusion detection system, hazardous material storage, sustainability enhancement measures, and energy monitoring control systems connection. Supporting facilities include site development, lighting, paving, parking, walkway, curbs and gutters, storm drainage, information systems, landscaping, signage, and utilities and connections. The facilities will be compatible with applicable Unified Facilities Criteria (UFC), Department of Defense (DoD), and Army/JBLM design standards applicable to a UEPH. The project will comply with DoD antiterrorism/force protection requirements per UFC. The facilities will be constructed to meet the requirements of UFC 1-200-02 High Performance and Sustainable Building Requirements. USACE requires all existing/new addition general building construction projects to integrate high performance and sustainable building guidelines in accordance with applicable UFC requirements, as well as other command specific energy efficiency standards. The estimated construction cost for this MILCON project is $7.9 Million. The estimated period of performance of this MILCON requirement is 540 calendar days.

Post-Bid

Military

$7,900,000.00

Public - Federal

Addition, Demolition, Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
88
Bidding Soon
1,117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

June 23, 2025

Project location map

To Be Determined, Joint Base Lewis McChord, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.