Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 12, 2025 at 8:00 PM
Updated June 13, 2025
Renovation of a military facility in Joint Base Lewis McChord, Washington. Working plans call for the renovation of a military facility.
Subject: Joint Base Lewis McChord, WA Multi Domain Task Force (MDTF) Buildings 3218-3219 NAICS Code: 236220 Commercial and Institutional Building Construction, size standard $45M Product Service Code: Y1AZ Construction of Other Administrative Facilities and Service Buildings Posted: 06/10/2025 Due: 06/24/2025 THIS IS A PROJECT LABOR AGREEMENT (PLA) SURVEY ONLY. THIS IS NOT A REQUEST FOR PROPOSAL, REQUEST FOR QUOTE, OR INVITATION FOR BID. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS OR DRAWINGS AVAILABLE AT THIS TIME. This is a SPECIAL NOTICE. No proposals are being requested or accepted with this notice. The Corps of Engineers Seattle District is soliciting comments from the construction community addressing the required use of PLA for large scale construction projects as defined by FAR 22.502 (Total estimated costs of the construction contract to the Federal Government is $35 million or more) within Tacoma, Washington. DESCRIPTION OF WORK: The U.S. Army Corps of Engineers (USACE) Seattle District has a requirement to convert two (2) existing barracks buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as "the Hammer Heads". The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle. The definitive removal / demolition work items for each building will require: a) Hazardous material / debris abatement and removal mostly within the crawl space b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc. c) Removal at ~ 90% removal of building mechanical - electrical systems d) Removal of the existing roof EPDM system (but not the roof framing structure) The definitive repair / new work items for each building will require: e) New exterior envelope f) New building mechanical - electrical systems g) New Thermoplastic Polyolefin (TPO) Roof system h) ADA upgrades - entry ramps, elevator for Building 3219 i) Painting of exteriors Other considerations for site work coordination: i) New utility connections (mostly by other entities) j) Shared construction boundaries with adjacent current and future projects MAGNITUDE: In accordance with DFARS 236.204, the magnitude of the estimated cost of construction (ECC) range for this project is between $25,000,000 and $100,000,000. FACTORS TO BE CONSIDERED: Some of the factors that may be considered regarding PLA use for this project are: FAR 22.504(d), Exceptions to project labor agreement requirements: (i): Requiring a project labor agreement on the project would not advance the Federal Government's interests in achieving economy and efficiency in Federal procurement. The exception shall be based on one or more of the following factors: (a) The project is of short duration and lacks operational complexity. (b) The project will involve only one craft or trade. (c) The project will involve specialized construction work that is available from only a limited number of contractors or subcontractors. (d) The agency's need for the project is of such an unusual and compelling urgency that a project labor agreement would be impracticable. (ii) Market research indicates requiring a PLA on this project would substantially reduce the number of potential Offerors to such a degree that adequate competition at a fair and reasonable price could not be achieved. (See FAR 10.002(b)(1) and FAR 36.104). (iii) Requiring a PLA on this project would otherwise be inconsistent with Federal statues, regulations, Executive Orders, or Presidential memoranda. FEDERAL ACQUISITION REGULATIONS (FAR): PLAs are required for all construction projects estimated at $35 Million or greater (using appropriated funds), unless an exception applies, as provided at FAR 22.504(d). INDUSTRY COMMENTS: The construction community is invited to comment on the use of PLAs using the following questions: 1) Do you have knowledge that a PLA has been used in the local area on projects of this kind If so, please provide supporting documentation. 2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project If so, please elaborate and provide supporting documentation where possible. 3) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed If so, please elaborate and provide supporting documentation where possible. 4) Identify specific reasons why or how you believe a PLA would advance the Federal Government's interest in achieving economy and efficiency in Federal procurement. 5) Identify specific reasons why you do not believe a PLA would advance the Federal Government's interest in achieving economy and efficiency in Federal procurement. 6) Identify any additional information you believe should be considered on the use of a PLA on the referenced project. 7) Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project. 8) Please provide a list of recent (2-5 years) construction projects in the local labor market of the project under consideration. The information gathered in this exercise should include the following information: a) Project Name and Location. b) Detailed Project Description. c) Initial Cost Estimate vs. Actual Final Cost. d) Was the project completed on time e) Number of craft trades present on the project. f) Was a PLA used g) Were there any challenges experienced during the project THIS IS NOT A SOLICITATION FOR PROPOSALS AND DOES NOT CONSTITUTE ANY COMMITMENT BY THE GOVERNMENT. Responses to this PLA market survey will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitations announcements separately from responses to this market survey. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Military
$100,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 11, 2025
To Be Determined, Joint Base Lewis McChord, WA
Related To This Project
Joint Base Lewis McChord, WA
Bid Date: Aug 11 2025
Joint Base Lewis McChord, WA
Bid Date: Sep 18 2025
Joint Base Lewis McChord, WA
Bid Date: Sep 16 2025
Joint Base Lewis McChord, WA
Bid Date: Oct 06 2025
Joint Base Lewis McChord, WA
Bid Date: Dec 01 2025
Joint Base Lewis McChord, WA
Bid Date: Sep 23 2025
Joint Base Lewis McChord, WA
Bid Date: Sep 23 2025
Joint Base Lewis McChord, WA
Bid Date: Oct 03 2025
Joint Base Lewis McChord, WA
Bid Date: Jul 23 2025
Joint Base Lewis McChord, WA
Bid Date: Jun 04 2025
Joint Base Lewis McChord, WA
Bid Date: Apr 24 2025
Joint Base Lewis McChord, WA
Bid Date: Aug 11 2025
Joint Base Lewis McChord, WA
Bid Date: May 05 2025
Joint Base Lewis McChord, WA
Bid Date: Jun 12 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
