Site work, paving and outdoor lighting for a mixed-use development in Lees Summit, Missouri. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
The Work for the project, Longview Pickleball Complex includes, but is not necessarily limited to: Construction of 12 regulation pickleball courts, post tension concrete construction, surface coating and markings, perimeter and interior fencing, sports lighting, canopy installation, sidewalks, earthworks, electrical, and water utilities. Each Bid shall enclose Bid Security, as specified in the Instructions to Bidders, representing five percent (5%) of the sum of the Bidder's Base Bid plus all alternates. Construction of 12 regulation pickleball courts, post tension concrete construction, surface coating and markings, perimeter and interior fencing, sports lighting, canopy installation, sidewalks, earthworks, electrical, and water utilities. Acquire permits or licenses per Section 1010. 5. Submit points of contact per Section 1015. 1. Project-specific plans. (I A. In accordance with Article 2 of GC-700, and additional items as required by the Owner, the following items shall be accomplished prior to the start ofthe Work: A. This Section is a non-exclusive list of various preliminary requirements that the Contractor shall comply with. This list does not include all contractual requirements, and it is important that the Contractor be familiar with all ofthe Contract Documents in order to ensure that all applicable requirements are met. A. The Contract Documents are complementary; what is required by one Contract Document is as binding as ifrequired by all. B. If there is a discrepancy among plans, specification, drawings, or other components of the Contract Documents, the order ofprecedence is listed below: 4. Meet coordination timelines and requirements per Section 1105. 8. Obtain Owner and/or Engineer's approval ofinstalled traffic control devices. 6. Attend preconstruction meetings per Section 1125. 7. Perform preconstruction documentation per Section 1130 The Project includes the following Work: The Work for the project, Longview Pickleball Complex includes, but is not necessarily limited to: Question Deadline 05/02/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. Question deadline updated to 6 May 2025 02:00 PM as per PBA, Questions are to be addressed to scasey@cityofls.net
Bid Results
Playgrounds / Parks / Athletic Fields
$127,050.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 9, 2025
June 7, 2025
Multiple Locations, Lees Summit, MO
Related To This Project
Lees Summit, MO
--
Lees Summit, MO
Bid Date: Jun 09 2025
Lees Summit, MO
Bid Date: May 29 2025
Lees Summit, MO
Bid Date: May 29 2025
Lees Summit, MO
Bid Date: Jun 06 2025
Lees Summit, MO
--
Lees Summit, MO
Bid Date: Jun 10 2025
Lees Summit, MO
--
Lees Summit, MO
Bid Date: May 05 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.