BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2025 at 8:00 PM

Updated May 30, 2025

Site work and paving for a bridge / tunnel in Lees Summit, Missouri. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Raintree Lake Spillway Bridge Rehabilitation A pre-bid conference will not be conducted for this project. Description: Hydrodemolition and scarification of bridge deck followed by monolithic deck repair and other superstructure repair, substructure repair, guardrail replacement, and any other incidental work in accordance with the plans and specifications. Question Deadline 05/22/2025 Contact information and submittal procedures for such questions are as follows: A. Electronically to Kim Ward, Staff Engineer, at Kim.Ward@ciftyofls.net . Questions received less than seven days prior to the date for opening of Bids may not be answered.

Bid Results

Bridges / Tunnels

$1,161,871.00

Public - City

Paving, Site Work

14

34

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
90
Bidding Soon
1,189
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

June 30, 2025

Project location map

SW Raintree Pkwy, Lees Summit, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.